My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS XR0001199
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
C
>
CHARTER
>
508
>
2900 - Site Mitigation Program
>
PR0536689
>
ARCHIVED REPORTS XR0001199
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/4/2019 1:38:30 PM
Creation date
3/4/2019 11:26:44 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0001199
RECORD_ID
PR0536689
PE
2957
FACILITY_ID
FA0021073
FACILITY_NAME
STKN CHARTER WAY COMMINGLED PLUME
STREET_NUMBER
508
Direction
W
STREET_NAME
CHARTER
STREET_TYPE
WAY
City
STOCKTON
Zip
95206
APN
16504016
CURRENT_STATUS
01
SITE_LOCATION
508 W CHARTER WAY
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
WNg
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
34
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SECOR www secor com <br /> INTERNATIONAL 3017 <br /> Ran <br /> S E C ® R INCORPORATED Kilgore Road 9, 10D <br /> Rancho Cordova,CAA 95670 <br /> 916-661-6400 TEL <br /> {� 916-661 0430 FAX <br /> 1 <br /> April 17, 2003 <br /> Margaret Lagono <br /> i <br /> San Joaquin County € 1 <br /> Environmental Health Department , <br /> 304 East Weber Avenue, Third Floor <br /> Stockton, CA 95202 <br /> RE Chevron Groundwater Monitoring Report (102003) <br /> Chevron Station 9-2033 <br /> 508 West Charter Way <br /> Stockton, California 'I <br /> SECOR Project filo 77CH 00000 00 0007 ' <br /> 1 <br /> Dear Ms Lagono <br /> SECOR International Incorporated is providing this report to summarize the recently <br /> completed groundwater-monitoring event at the above referenced site The site is located at 508 <br /> West Charter Way, Stockton, California <br /> COMPLETED ACTIVITIES - FIRST QUARTER 2003 <br /> o Conducted quarterly groundwater monitoring and sampling <br /> a Prepared and submitted quarterly groundwater monitoring report <br /> PLANNED ACTIVITIES - SECOND QUARTER 2003 <br /> ■ Conduct quarterly groundwater monitoring and sampling <br /> • Prepare and submit quarterly groundwater monitoring report <br /> DISCUSSION <br /> The quarterly monitoring and sampling was performed by Gettler-Ryan, Inc (G-R) This <br /> groundwater monitoring and sampling event was performed on February 12, 2003 G-R's <br /> groundwater monitoring report is included as Attachment A Depth to groundwater across the site <br /> was approximately 21 feet below ground surface Groundwater elevation across the site decreased <br /> an average of 1 17 feet from the previous sampling event Groundwater flow was to the northeast at <br /> an approximate gradient of 0 01 ft/ft A summary of laboratory results are listed below <br /> 11ChevroM92033IPenodre Monrtonng420031102003 QMR 92033 doc SECOR Intematronal Incorporated <br />
The URL can be used to link to this page
Your browser does not support the video tag.