My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS XR0001202
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
C
>
CHARTER
>
508
>
2900 - Site Mitigation Program
>
PR0536689
>
ARCHIVED REPORTS XR0001202
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/4/2019 5:12:06 PM
Creation date
3/4/2019 11:27:34 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0001202
RECORD_ID
PR0536689
PE
2957
FACILITY_ID
FA0021073
FACILITY_NAME
STKN CHARTER WAY COMMINGLED PLUME
STREET_NUMBER
508
Direction
W
STREET_NAME
CHARTER
STREET_TYPE
WAY
City
STOCKTON
Zip
95206
APN
16504016
CURRENT_STATUS
01
SITE_LOCATION
508 W CHARTER WAY
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
WNg
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
35
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Date July 22 2002 5lr:�COR <br /> International Incorporated <br /> CHEVRON GROUNDWATER MONITORING REPORT (2Q2002) <br /> Primary Agency Margaret Lagorio <br /> San Joaquin County U l[E� D <br /> Environmental Health Division <br /> 304 East Weber Avenue,Third Floor <br /> Stockton,CA 95202 J U L 2 3 2002 <br /> ENVIRONMENT HEALTH <br /> PERMIT/SERVICES <br /> Facility No 9-2033 Address 508 West Charter Way,Stockton,California <br /> CHEVRON Project Manager Robert Cochran <br /> Consulting Co/Contact Person SECOR International,Inc — Scott Gable <br /> Consultant Project No 77CH.00000.00 0007 <br /> Assembly Bill 581 Status Property Owner. Pearl Myer,Stockton CA <br /> WORK PERFORMED THIS QUARTER: Second Quarter-2002: <br /> 1 Conducted quarterly groundwater monitoring and sampling <br /> i2 Prepared and submitted groundwater monitoring report <br /> J <br /> , <br /> WORK PROPOSED FOR NEXT QUARTER: Third Quarter - 2002: , <br /> 1 Conduct quarterly groundwater monitoring and sapling <br /> 2 Prepare and submit groundwater monitoring report <br /> QUARTERLY RESULTS SUMMARY: y ' <br /> Current Phase of Project Monitoring and Sampling, Site Assessment <br /> Frequency of Groundwater Sampling _12uarterly <br /> Frequency of Groundwater Monitoring QuarterlyIs Free Product(FP)Present On-Site No <br /> Current Remediation Techniques NIA <br /> Approximate Depth to Groundwater 20 12 to 20 98 feet <br /> Groundwater Gradient East @ 0 006 ft/ft <br /> • <br /> 3017 Kilgore Road, Suite 100, Rancho Cordova, CA 95670 916 861 0400 916 861 0430 Fax www secor com <br />
The URL can be used to link to this page
Your browser does not support the video tag.