Laserfiche WebLink
N <br /> Date October 12,2001 SECOR <br /> International Incorporated <br /> �1 DC; 1 � P,f 1� D7 <br /> CHEVRON GROUNDWATER MONITORING REPORT (3Q2001) <br /> Primary Agency Dot Lofstrom <br /> San Joaquin County <br /> Environmental Health Division <br /> 304 East Weber Avenue,Third Floor <br /> Stockton,CA 95202 <br /> Facility No 9-2033 Address 508 West Charter Way,Stockton,California <br /> CHEVRON Project Manager Robert Cochran <br /> Consulting Co/Contact Person SECOR International, Inc — Scott Gable <br /> Consultant Project No 077 43461 006 <br /> Assembly Bill 681 Status Property Owner Pearl Myer, Stockton,CA <br /> WORK PERFORMED THIS QUARTER: Third Quarter—2001: <br /> 1 Conducted quarterly groundwater monitoring and sampling <br /> 2 Prepared and submitted groundwater monitoring report <br /> WORK PROPOSED FOR NEXT QUARTER: Fourth Quarter- 2001. <br /> 1 Conduct quarterly groundwater monitoring and sampling <br /> 2 Prepare and submit groundwater monitoring report <br /> 3 Develop Work Plan Addendum for site assessment <br /> QUARTERLY RESULTS SUMMARY: <br /> Current Phase of Project Monitoring and Sampling,Site Assessment <br /> Frequency of Groundwater Sampling Quarterly <br /> Frequency of Groundwater Monitoring Quarterly <br /> Is Free Product(FP) Present On-Site No <br /> Current Remediation Techniques N/A <br /> Approximate Depth to Groundwater 21 to 22feet <br /> Groundwater Gradient North @ 0 02 fllft <br /> i <br /> 3017 Kilgore Road, Suite 100, Rancho Cordova, CA 95670 916 861 0400 916 861 0430 Fax www secor cam <br />