My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS XR0001214
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
C
>
CHARTER
>
508
>
2900 - Site Mitigation Program
>
PR0536689
>
ARCHIVED REPORTS XR0001214
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/4/2019 2:06:41 PM
Creation date
3/4/2019 11:45:36 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0001214
RECORD_ID
PR0536689
PE
2957
FACILITY_ID
FA0021073
FACILITY_NAME
STKN CHARTER WAY COMMINGLED PLUME
STREET_NUMBER
508
Direction
W
STREET_NAME
CHARTER
STREET_TYPE
WAY
City
STOCKTON
Zip
95206
APN
16504016
CURRENT_STATUS
01
SITE_LOCATION
508 W CHARTER WAY
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
WNg
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
128
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Chevron Products Company 5 <br /> Chevron Service Station#9 2033 508 West Charter Way Stockton CA March 5 2002 <br /> certified laboratory for analysis of TPHg using modified EPA Method 8015, and <br /> BTEX, and MtBE by EPA Method 8260 <br /> • Monitoring Well Development and Sampling. Following well installation, the <br /> monitoring wells will be developed by rigorously surging the wells over the <br /> length of the screen Interval and by purging approximately 10 casing volumes of <br /> water After well development, groundwater samples will be collected and <br /> submitted under standard chain-of-custody procedures to a California State- <br /> certified laboratory The groundwater samples will be analyzed for TPHg using <br /> modified EPA Method 8015, BTEX, and MtBE using EPA Method 8260 <br /> • Well Surveying and Groundwater Gradient Interpretation. A state-licensed <br /> surveyor will survey the newly Installed wells Depth to groundwater <br /> measurements will be collected during sampling activities and utilized for <br /> Interpretation of groundwater flow and gradient beneath the site <br /> • Slug Tests. Slug tests will be performed in each of the five newly Installed <br /> monitoring wells to derive values for transmissivity (T) and hydraulic <br /> conductivity (K) <br /> • Report. A report will be prepared after completion of necessary fieldwork The <br /> report will Include soil boring logs, soil and groundwater analytical results, <br /> chain-of-custody record, and conclusions <br /> Proposed field and laboratory procedures are presented as Attachment B <br /> SCHEDULE <br /> SECOR is prepared to Initiate fieldwork within 4 weeks following approval of this work <br /> plan and Issuance of permits by San Joaquin County A report documenting the <br /> findings of the well Installation can be prepared in approximately 8 to 10 weeks after the <br /> completion of the fieldwork and receipt of all analytical data <br /> If there are any questions regarding the contents of this work plan, please call Scott <br /> Gable at (916) 861-0400 extension 231 or Bob Cochran of Chevron at (925)-842-9655 <br /> Sincerely, <br /> SECOR International, Incorporated <br /> Bob W Jackson Jr o t Gable, 63 ?,ED GED <br /> Staff Geologist �k,?j j Principal Geology SCOTT <br /> iCf- <br /> j ppG{�3D+rLE o� <br /> '0n P40 LJFa P <br /> ,A Exp <br /> I 1Chevron1920331REPORTSI9-2033 SA CPT WPFA doe F � . <br /> OF C A�-�4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.