Laserfiche WebLink
i • <br /> EXPLANATION <br /> WEST CHARTER WAY Groundwater monitoring well <br /> A/9/CID Total Petroleum Hydrocarbons <br /> (TPH) as Diesel/TPN as <br /> Gasoline/Benzene/MTBE <br /> Planter �MW-3concentrations in ppb <br /> NA/8,300/ NA Not Analyzed <br /> 120/9 <br /> Dispenser <br /> Island I ff-Q Benzene and MTBE analyses <br /> by EPA Method 8260 <br /> a W <br /> W <br /> Underground ; H <br /> Storage a <br /> J <br /> �Tonks Dispenser Z <br /> I � � Island I O <br /> v <br /> NA/110/ Z <br /> / 600 <br /> J <br /> Waste od <311 <br /> MW-21 <br /> I * Tank <br /> MW-1 Concrete <br /> 590/<50/<0 5/3 <br /> Station Budding <br /> Planter <br /> _Elanter <br /> Block Wall <br /> —N- <br /> 0 30 <br /> Scale in Feet <br /> Source R ure modified from drawinG Drovided by RRM ergineering engineeringcontracting firm <br /> CONCENTRATION MAP FIGURE <br /> GETTLER - RYAN INC. Chevron Service Station #9-2033 <br /> 6747 Sierra Ct Suite J 508 West Charter Way 2 <br /> Dublin CA 94568 (925) 551-7555 Stockton, California <br /> PROJECT NUMBER REVIEWED BY DATE REVISED DATE <br /> 388847 Au ust 9 2004 <br /> FILE NAME P Enviro Chevron 9-2033 Q04-9-2033 DWG Layaut Tab Coni <br />