My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS XR0001224
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
C
>
CHARTER
>
508
>
2900 - Site Mitigation Program
>
PR0536689
>
ARCHIVED REPORTS XR0001224
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/4/2019 4:26:20 PM
Creation date
3/4/2019 1:04:57 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0001224
RECORD_ID
PR0536689
PE
2957
FACILITY_ID
FA0021073
FACILITY_NAME
STKN CHARTER WAY COMMINGLED PLUME
STREET_NUMBER
508
Direction
W
STREET_NAME
CHARTER
STREET_TYPE
WAY
City
STOCKTON
Zip
95206
APN
16504016
CURRENT_STATUS
01
SITE_LOCATION
508 W CHARTER WAY
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
WNg
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
32
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SECOR www secor com <br /> Kilgore Road Suite 100 <br /> 3017 Kil <br /> INTERNATIONAL 9 <br /> ® INCORPORATED Rancho Cordova CA 95670 <br /> 916-861-0400 TEL <br /> 916-661-0430 ria <br /> Apnl 30, 2004 i <br /> s <br /> Ece� <br /> Vicki McCartney APR 2 9 2004 <br /> San Joaquin County <br /> Environmental Health Department SNVIR01VMUNT HEALTH <br /> 304 East Weber Avenue, Third Floor PERMIT/SERVICES J <br /> Stockton, California 95202-2708 <br /> RE Chevron Groundwater Monitoring Report(102004) <br /> o r <br /> Chevron Station 9-2033 4 <br /> 508 West Charter Way -Y <br /> i <br /> Stockton, California <br /> SECOR Protect No 77CH 00000 23 0009 <br /> ,i <br /> Dear Ms McCartney s <br /> SECOR International Incorporated is providing this report to summarize the recently completed <br /> groundwater-monitoring event at the above referenced site <br /> COMPLETED ACTIVITIES - FIRST QUARTER 2004 <br /> ■ Conducted quarterly groundwater monitoring and sampling 1 <br /> . ■ Prepared and submitted quarterly groundwater monitoring report <br /> PLANNED ACTIVITIES - SECOND QUARTER 2004 <br /> ■ Conduct quarterly groundwater monitoring and sampling <br /> ■ Prepare and submit quarterly groundwater monitoring report <br /> DISCUSSION <br /> On February 9, 2004, Gettler-Ryan Incorporated (G-R) performed the first quarter groundwater <br /> monitoring and sampling event for 2004 G-R's groundwater monitoring report is included as <br /> Attachment 1 Depth to groundwater across the site ranged from 21 89 to 22 71 feet below ground - <br /> surface (bgs) Groundwater elevation across the site decreased an average of 0 31 feet from the <br /> previous sampling event 0 The groundwater direction was reported to the northeast at an <br /> approximate gradient of 0 06 feet per foot (ft/ft) Three wells were sampled during the event A <br /> summary of laboratory results are listed below <br /> • <br /> 11Chevron192M Penodre Monrtonng120040Q2004 QMR 92033 doc SECOR International Incorporated <br />
The URL can be used to link to this page
Your browser does not support the video tag.