Laserfiche WebLink
APPENDIX O <br /> FIELD AND LABORATORY PROCEDURES <br /> Soil Cuttings and Rinsate Water <br /> Soil cuttings generated during drilling operations will be temporarily stored on site and covered with <br /> plastic sheeting pending characterization and disposal Sod cuttings will be removed by Chevron's <br /> disposal contractor to an appropriate disposal facility Water generated during steam cleaning will be <br /> temporarily stored in department of transportation (DOT) approved 55-gallon drums pending <br /> transport by Chevron's disposal contractor to an appropriate disposal or treatment facility Soil <br /> cuttings and ansate water drums will be appropriately labeled and stored temporarily on-site for <br /> approximately 4 to 8 weeks pending profiling and acceptance at a Chevron approved waste disposal <br /> facility <br />