My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS XR0001225
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
C
>
CHARTER
>
508
>
2900 - Site Mitigation Program
>
PR0536689
>
ARCHIVED REPORTS XR0001225
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/4/2019 5:24:59 PM
Creation date
3/4/2019 1:06:57 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0001225
RECORD_ID
PR0536689
PE
2957
FACILITY_ID
FA0021073
FACILITY_NAME
STKN CHARTER WAY COMMINGLED PLUME
STREET_NUMBER
508
Direction
W
STREET_NAME
CHARTER
STREET_TYPE
WAY
City
STOCKTON
Zip
95206
APN
16504016
CURRENT_STATUS
01
SITE_LOCATION
508 W CHARTER WAY
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
WNg
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
195
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
S E C ® R <br /> • Conceptual Site Model R, <br /> March 24, 2004 <br /> rt <br /> Page I <br /> k4� <br /> TABLE OF CONTENTS "r <br /> 1 , <br /> 1 0 INTRODUCTION 3 <br /> 1 1 OBJECTIVES 1 ` <br /> 4� <br /> 2 0 SITE DESCRIPTION AND FEATURES 1 <br /> 21 Geology 1 <br /> 2 2 Hydrogeology 2 sg <br /> 2 2 1 Groundwater Flow Rates and Directions 2 ' <br /> 222 Groundwater Use 2 <br /> 2 3 Surface Water 2 <br /> 2 4 Local Land Use 3 <br /> 241 Aerial Photograph Review 3 <br /> 242 Topographic Map Review 3 y <br /> 3 0 PREVIOUS INVESTIGATIONS . 4 <br /> 31 Groundwater Technology Monitoring Well and Soil Boring Installation, March 1995 4 <br /> 32 Touchstone Developments Environmental Management Report, UST Closure <br /> Report and Limited Over-excavation Sampling Report, Dated August 7, 1997 4 <br /> 33 SECOR International Incorporated, Assessment Report, Dated January 18, 2001 5 <br /> 34 SECOR International Incorporated, Assessment Report and Work Plan for Further ' <br /> Assessment, Dated March 5, 2002 5 <br /> 40 SOIL DATA SUMMARY 5 <br /> 41 1 March 1995, Monitoring Well Installation 5 <br /> 4 1 2 September 1996, USTs, Hydraulic Hoists, Product Dispensers, and Product Lines <br /> 6 k-0 <br /> Removal1 <br /> 4 1 3 August 2000, Site Assessment 7 <br /> 4 1 4 Petroleum Hydrocarbons Adsorbed in Soil 7 <br /> 5 0 GROUNDWATER MONITORING AND SAMPLING 8 <br /> 5 1 Groundwater Chemical Concentration Trends 8 ti <br /> 5 1 1 Onsite Groundwater Analytical Data 9 <br /> 5 1 2 Offsite Groundwater Analytical Data 9 <br /> 5 1 3 Estimated Mass of Petroleum Hydrocarbons Remaining in Groundwater 9 <br /> 5 2 Chemical Concentrations versus Time 10 <br /> 5 3 Groundwater Elevations versus Time 10 <br /> I <br /> 6 0 SOURCES OF IMPACTS 10 <br /> 6 1 Chevron Service Station 9-2033 11 <br /> 6 2 Former Texaco Service Station 11 f <br /> 6 2 1 Site Description 11 <br /> 11 <br /> 622 Remedial Activities <br /> 623 Historical Report Summary 11 <br /> 6 3 Former Arco Service Station 2168 12 <br /> . 6 3 1 Site Description 12 <br /> 632 Remedial Activities 12 <br /> 6 3 3 Historical Report Summary 13 <br /> 1 1Clievron192033\RFPORTSICSMICSM 92033 (REV B) doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.