Laserfiche WebLink
STANDARD OPERATING PROCEDURE- <br /> GROUNDWATER SAMPLING <br /> Gettler-Ryan Inc field personnel adhere to the following procedures for the collection and handling of <br /> groundwater samples prior to anal ''is by the analytical laboratory. Prior to sample collection,the type of <br /> analysis to be performed is determined Loss prevention of volatile compounds is controlled and sample <br /> preservation for subsequent analysis is maintained. <br /> Prior to sampling,the presence or absence of free-phase hydrocarbons is determined using an interface <br /> Probe Product thickness,if present,is measured to the nearest 0 01 foot and is noted in the field notes <br /> In addition,all depth to water level measurements are collected with a static water level indicator and are <br /> also recorded in the field notes,prior to purging and sampling any wells. <br /> After water levels are collected and prior to sampling, if purging is to occur, each well is purged a <br /> minimum of three well casing volumes of water using pre-cleaned pumps(stack, suction,Grundfos),or <br /> disposable bailers Temperature,pH and electrical conductivity are measured a minimum of three times <br /> during the purging Purging continues until these parameters stabilize <br /> Groundwater samples are collected using disposable bailers. The water samples are transferred from the <br /> • bailer into appropriate containers Pre-preserved containers,supplied by analytical laboratories,are used <br /> when possible When pre-preserved containers are not available,the laboratory is instructed to preserve <br /> The sample as appropriate Duplicate samples are collected for the laboratory to use in maintaining <br /> quality assurance/quality control standards The samples are labeled to include the fob number, sample <br /> identification,collection date and time,analysis,preservation(if any),and the sample collector's initials <br /> The water samples are placed in a cooler, maintained at 4oC for transport to the laboratory. Once <br /> collected in the field,all samples are maintained under chain of custody until delivered to the laboratory. <br /> The chain of custody document includes the job number,type of preservation,if any,analysis requested, <br /> sample identification, date and time collected, and the sample collector's name The chain of custody is <br /> signed and dated (including time of transfer) by each person who receives or surrenders the samples, <br /> beginning with the field personnel and ending with the laboratory personnel <br /> A laboratory supplied trip blank accompanies each sampling set For sampling sets greater than 20 <br /> samples, 5%trip blanks are included The trip blank is analyzed for some or all of the same compounds <br /> as the groundwater samples <br /> As requested by Chevron Products Company, the purge water and decontamination water generated <br /> during sampling activities is transported by lWM to McKittrick Waste Management located in <br /> McKittnck. California <br /> N,lca1domwUorm\chevron-S0V 04.03.03 <br />