Laserfiche WebLink
the f1*0UP- <br />Ms. <br />Lori Duncan <br />San Joaquin County Public Health Services <br />Environmental Health Division <br />304 East Weber Avenue, Third Floor <br />Stockton, California 95202 <br />q <br />Corporation <br />�6 ,North 11arket Boulevard <br />Sacramento, C1 95834-1912 <br />Tel. 916.928.3300 <br />H ax. 916.928.3341 <br />A Memher ol'The IT Croup <br />April 12, 2002 <br />Project 880-039.1A <br />Re: Groundwater Monitoring Well Installation Work Plan Addendum No. 1 <br />And Feasibility Study <br />Don Rogers Transmission Shop <br />515 West Charter Way <br />Stockton, California <br />Dear Ms. Duncan: <br />On behalf of Mr. Don Rodgers, IT Corporation (IT) has prepared this workplan <br />addendum for the Transmission Shop located at 515 West Charter Way in Stockton, <br />California. This report is intended to provide additional information requested by the <br />San Joaquin County Public Health Services, Environmental Health Department <br />(SJCEHD) in their letter dated March 22, 2002. A Groundwater Monitoring Well <br />Installation Work Plan, dated March 13, 2002, was submitted to SJCEHD, which <br />presented the proposed scope of work to be completed. <br />ADDITIONAL SCOPE OF WORK <br />In addition to the two shallow groundwater monitoring wells proposed in the <br />March 13, 2002 work plan, IT proposes to install one groundwater monitoring well pair <br />in the location of the proposed deep soil boring. The deep soil boring described in the <br />March 13, 2002 workplan will be replaced with the deep well described in this <br />addendum. Drilling and sampling procedures are included in Attachment A. IT has also <br />included information on completing feasibility testing for groundwater remediation. <br />IT CORPORATION <br />SAC:\\\SACRFP 1 \COMMON\sacDP\2002\PRJ\PJ8\880\8800391 A.2ac.doc <br />(01040000) <br />