My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
C
>
CHARTER
>
515
>
2900 - Site Mitigation Program
>
PR0527799
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/4/2019 2:43:14 PM
Creation date
3/4/2019 1:26:48 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
WORK PLANS
RECORD_ID
PR0527799
PE
2960
FACILITY_ID
FA0018844
FACILITY_NAME
TRANSMISSION STORE
STREET_NUMBER
515
Direction
W
STREET_NAME
CHARTER
STREET_TYPE
WAY
City
STOCKTON
Zip
95206
APN
14707408
CURRENT_STATUS
01
SITE_LOCATION
515 W CHARTER WAY
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
WNg
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
124
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Ms. Lori Duncan <br />April 12, 2002 <br />Page 3 <br />Project 880-039.1A <br />petroleum hydrocarbons as gasoline (TPHg) by modified EPA Method 8015; benzene, <br />toluene, ethylbenzene, total xylenes (BTEX) and di -isopropyl ether (DIPE), ethyl tertiary <br />butyl ether (ETBE), MtBE, tertiary amyl methyl ether (TAME), and tertiary butyl <br />alcohol (TBA), collectively the `five oxygenates', by EPA Method 8260B. In addition <br />all soil samples submitted for analysis during this additional investigation activities will <br />be analyzed for 1,2-dichloroethane and ethylene dibromide by EPA Method 8260B. <br />Soil samples will be selected based on the highest photo -ionization detector (PID) <br />readings below 40 -feet bgs, soil water interface and from the bottom of the boring. <br />Well Development <br />The groundwater monitoring wells will be developed after completion. The <br />development procedure for each well will consist of pumping or bailing water from the <br />well until the water is visibly clear, the well goes dry, or until a maximum of ten casing <br />volumes have been removed. <br />Groundwater Analysis <br />Following monitoring well development, groundwater samples will be collected and <br />submitted to a California State -certified laboratory for analysis. Groundwater samples <br />will be analyzed for the presence of TPH-g, BTEX, and for five oxygenates (MtBE, <br />DIPE, ETBE, TAME and TBA) using EPA Methods 8015 Modified and 826013, <br />respectively. In addition groundwater samples collected during additional investigation <br />activities will be analyzed for 1,2-dichloroethane and ethylene dibromide by EPA <br />Method 8260B. <br />Well Surveying <br />Upon completion of well construction, the wells will be surveyed by a licensed surveyor <br />for location and elevation relative to mean sea level. Horizontal and vertical <br />groundwater gradient will be interpreted utilizing wellhead elevations and depths to <br />water. <br />IT CORPORATION <br />SAC:\\\SACRFP 1 \COMMON\sacDP\2002\PRJ\PJ8\880\8800391 A.2ac.doc <br />(01040000) <br />
The URL can be used to link to this page
Your browser does not support the video tag.