My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
C
>
CHARTER
>
515
>
2900 - Site Mitigation Program
>
PR0527799
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/4/2019 2:43:14 PM
Creation date
3/4/2019 1:26:48 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
WORK PLANS
RECORD_ID
PR0527799
PE
2960
FACILITY_ID
FA0018844
FACILITY_NAME
TRANSMISSION STORE
STREET_NUMBER
515
Direction
W
STREET_NAME
CHARTER
STREET_TYPE
WAY
City
STOCKTON
Zip
95206
APN
14707408
CURRENT_STATUS
01
SITE_LOCATION
515 W CHARTER WAY
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
WNg
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
124
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Ms. Lori Duncan <br />April 12, 2002 <br />Page 9 <br />Project 880-039.1A <br />Air pressure will be increased from 10 pounds per square inch (psi) to a level that will <br />allow air flow into the well at approximately 4 cubic feet per minute (cfm). After <br />approximately 20 minutes into the test, helium will be blended to the injection air at a <br />rate of 1 cfm. <br />The radius of influence for the air sparge wells will be estimated by evaluating the <br />changes in pressures, DO, CO2 and petroleum hydrocarbon concentrations and by the <br />detection of the helium tracer gas at monitoring locations. <br />TECHNICAL REPORT <br />IT will prepare a report summarizing the procedures, field results, and analytical results <br />approximately 60 days following completion of all fieldwork. The report will include an <br />evaluation of current site conditions and recommendations for additional work if <br />appropriate. <br />SCHEDULE <br />IT is prepared to initiate the well installations upon approval from the SJCEHD. Once <br />approval is granted, IT will submit a pre -approval to the Underground Storage Tank <br />Fund, obtain site access agreements, submit the well permits to the SJCEHD and <br />schedule the work with the subcontractors. Feasibility testing will be completed <br />following well installation and development. The SJCEHD will be notified forty-eight <br />hours prior to any site fieldwork. <br />IT CORPORATION <br />SAC:\N:\sacDP\2002\PRJ\PJ8\880\8800391 A.2ac.doc <br />(01040000) <br />
The URL can be used to link to this page
Your browser does not support the video tag.