Laserfiche WebLink
Ms Lori Duncan Project No 880-039 1A 01010000 <br /> October 25, 2005 <br /> Page 4 <br /> product or sheen were present in any of the wells or groundwater samples Graphs showing <br /> TPHg and benzene concentrations and groundwater elevations versus time in wells MW-1R, <br /> VW-2, and VW-3 are presented in Appendix D <br /> The SVE system was temporarily shut down on October 1, 2004, and has yet to be restarted <br /> Shaw will continue to perform quarterly groundwater sampling The next sampling event is <br /> tentatively scheduled for November 2005 <br /> K W0039 Don Rodgersftndonng RpisW503 da SHAW ENVIRONMENTAL,INC <br />