My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS XR0001164
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
C
>
CHARTER
>
515
>
2900 - Site Mitigation Program
>
PR0527799
>
ARCHIVED REPORTS XR0001164
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/4/2019 7:50:23 PM
Creation date
3/4/2019 1:33:33 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0001164
RECORD_ID
PR0527799
PE
2960
FACILITY_ID
FA0018844
FACILITY_NAME
TRANSMISSION STORE
STREET_NUMBER
515
Direction
W
STREET_NAME
CHARTER
STREET_TYPE
WAY
City
STOCKTON
Zip
95206
APN
14707408
CURRENT_STATUS
01
SITE_LOCATION
515 W CHARTER WAY
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
WNg
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
59
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
t i _ <br /> Ms Lori Duncan Project No 880-039 1 A 01010000 <br /> February 02, 2005 <br /> Page 3 <br />' those results quarterly to the air board On October 1, 2004, the remediation system was <br /> temporarily shut down due to fiscal constraints and remained off through the remainder <br /> of the quarter The County of San Joaquin was notified about the shut down <br /> Sampling Results <br />' No vapor samples were collected from treatment system's influent and effluent <br /> System Performance Status <br /> In the 94 days between September 29, 2004 and December 31, 2004, the treatment <br /> 1 system ran approximately 2 days (2 percent operational) <br /> Remediation System Performance Summary <br /> TPHg removed since February 3,2000 startup 3,244 lbs <br /> TPHg removed during this reporting period 0 lbs <br /> TPHg daily removal rate during reporting period 0 Ibsld <br /> TPHg destruction efficiency 0% <br /> TPHg emission rate to atmosphere 0 Ibsld <br /> benzene removed since startup 4 9 lbs <br /> benzene removed during this reporting period 0 lbs <br /> Benzene Destruction Efficiency 0% <br /> Benzene emission rate to atmosphere 0 lbsld <br /> Average flow rate for this reporting period 0 SUM <br /> System uptime during this reporting period 2 days 12% <br /> CONCLUSIONS <br /> Analytical results of groundwater samples collected from the site were generally consistent <br /> with previous sampling events Samples from well MW-4R-D have continued to indicate <br /> declining concentrations Groundwater elevation decreased in all wells between 0 66 and <br /> 0 93 feet from the August 9, 2004 sampling event The groundwater elevations during the <br /> fourth quarter 2004 indicated a trough that trended to the northeast Graphs showing TPHg <br /> and benzene concentrations, and groundwater elevations versus time in wells MW-1R, <br /> VW-2, and VW-3 are presented in Appendix D <br /> N 1sacDP120051Pra188018800391A 5aa doc SHAW ENVIRONMENTAL,INC <br />
The URL can be used to link to this page
Your browser does not support the video tag.