Laserfiche WebLink
EVENT SUMMARY <br /> TO: David Herzog, Project Manager DATE: 1115103 <br /> Sacramento Office <br /> FROM: Sheila Richgels, Sampling Coord <br /> Sacramento Office <br /> RE: Don Rodgers—4th Qtr 2003 Sampling Event <br /> Field sheets are attached for the quarterly sampling performed at the Don Rodgers site <br /> Six of the site wells were sampled on 11/03/03 by Paul Weinhardt Well VW-1D was dry <br /> and not sampled Well MW-2R was not accessible due to a dangerous dog (pit buil) <br /> Sampling was coordinated with Blaine Tech and Gettler-Ryan <br /> Lori Duncan was notified prior to the event <br /> Purge water (131 25 gls) was pumped into the office tank for disposal later by ABCO <br /> Samples were delivered to STL-Sacto Lab on 11/03/03 <br />