Laserfiche WebLink
IMr Tom Busenbark Project No 880-039 1A <br /> i July 9, 2003 <br /> Page 6 <br /> Graphs showing TPHg, benzene, MTBE concentrations, and groundwater elevations <br /> versus time in wells MW-1R, VW-2, and VW-3 are presented in Appendix E <br />' <br /> Approximately three pounds of T <br /> PHg were removed during the second quarter 2003 The <br /> system performed in compliance with permit requirements Pulsed operation of the SVE <br /> system began in the second quarter 2002, and continued during the second quarter 2003 <br /> Shaw will continue to perform quarterly groundwater sampling The next sampling <br /> event is tentatively scheduled for August 2003 <br /> Please call David Herzog at (916) 565-4377, if you have questions regarding this report <br /> or any aspect of the project "I'Ep GE—ZO <br /> Sincerely, U ���W. <br /> o <br /> SHAW ENVIRONMENTAL, INC � N0.7219 � <br /> Fob Benjamin Chevlen David W Herzo 7 OF C►�-� <br /> Staff Geologist Project Manager <br /> N\sacDP,20031PrJN8M8800391A 3afdoc Shaw Environmental, Inc <br /> (01050000) <br />