My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS XR0001174
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
C
>
CHARTER
>
515
>
2900 - Site Mitigation Program
>
PR0527799
>
ARCHIVED REPORTS XR0001174
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/4/2019 3:22:38 PM
Creation date
3/4/2019 1:39:33 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0001174
RECORD_ID
PR0527799
PE
2960
FACILITY_ID
FA0018844
FACILITY_NAME
TRANSMISSION STORE
STREET_NUMBER
515
Direction
W
STREET_NAME
CHARTER
STREET_TYPE
WAY
City
STOCKTON
Zip
95206
APN
14707408
CURRENT_STATUS
01
SITE_LOCATION
515 W CHARTER WAY
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
WNg
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
45
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SIN.i0A0uw COUA <br /> ENVIRONMENTAL HEALTH DIVISION! <br /> ,f 304 E-Weber Ave.Third Floor <br /> PO Box 388, Stockton, CA 95201-0388 <br /> Phone: (209)458-3420 <br /> b Approved <br /> ®Approved with change-s- See Remarks <br /> ❑Disapproved See Remarks ' <br /> Remarks "" cow 6Q+0� <br /> Au, fmg Emcon <br /> &LsL <br /> .h 1433 NC"MciW S0U&,,ar, SaCfaMenso Cabtomia 95834-I94a r(916)M 3300-Fox(9 1b)925 3341 <br /> DaEte.A alp <br /> By-- <br /> Approval of these plans extends only to that May l- 1996 <br /> h Proposal P9fi050 31 <br /> which is shown and described hereon but <br /> does not authonze or approve any omission Mr Don Rodgers <br /> or deviation of requirements of State laws or 11900 South Union Road <br /> Local Ordinances- Manteca,California 95336 <br /> Re Proposal and Estimated Budget to Conduct a Sod and Groundwater Assessment <br /> and Remedial Action lnvesugatLon at the Property Located a 515 West Charter <br /> Way,Stockton California <br /> ftti <br /> / 5 SIS l5 �E 6 hoes � mwt,,4 L.AgllllGt <br /> lifoj Dear%4r Rodgers <br /> " 0 A L M{ UEh 8Q&AN bdF(%V- ?WfK EMCON 1s pleased to have the opportunity to submit this proposal to conduct an <br /> t%�alaAP&4 Z-w& 4kftm P9�/" � 1, addittonal soil and groundwater Investigation at the subject site (see Figure l) The <br /> ` y + It[G�W! purpose of the investigation is to 1) assess the lateral and vertical extent of sots and <br /> u'TnnlulY� srrmtu lm�� a�t()llir J�II. Q�Q groundwater contamination beneath the site, 2)conduct appropriate remedial feasibility <br /> studies (if warranted) 3) prepare a Corrective Action Plan (CAP) and 4) conduct <br /> /wfU Iti1] ItNICN hCl �j� quarterly groundwater monitoring of the newly installed weil(s) This proposal also <br /> �S A ���� ri�� �� Includes selected unit price scopes and associated costs 1n the event that additional <br /> 1GY t C � assessment.feasibility activities and subsequent reporting is necessary 'litre proposal has <br /> S1fY1li� Q ��(��(�ti l 111f1.',pi �T been prepared consistent with your Request for Proposal(RFP) received by EMCON on <br /> IV 11CfWWiLTtw April 30,1996 <br /> lV ,//�� 1 r The RFP requested the drilling of at least 3 soil bonngs to determine the extent of soil <br /> l&1)1NbJ bf*ufi I&t contamination installing monitoring weil(s) sufficient to determine the extent of <br /> �� PL1i�W�4ti �YQ q,hkti`+1� A��„��� groundwater contamtnazton installing at least 3 vapor extraction wells and installing <br /> pp�`�� f lir asparge well Based on a conversation with San Joaquin County Public Health <br /> I QUT) L-1 fAWNIA Ikm ?62M ab101 ) �iM 61uAt ba,4M Services (SJCPHS) and EMCON's understanding of project conditions at the adjacent <br /> sites(ARCO Texaco and Chevron Ser-,ice Stauons) EMCON is presenting a modified <br /> version of the scope of work outlined 1n the RFP EMCON believes the scope of work <br /> Olt) <br /> Ib d„d �� , presented in this proposal will accomplish the objectives outlined m the RFY m the most <br /> _I uiY/R 5ie 6AS�D cost-effecuve manner The tint price scopes contained to this proposal wthl allow Specific <br /> tasks to be implemented(if warranted) during field operations in order to complete the <br /> investigation expeditiously and cost effectively The following sections present <br /> EMCON's project approach scope of work,project schedule and cost estimate <br /> f�f PonlS�iSL� ?AeM TD bPt dLa, /flML �,tp4p a <br /> �L111�.inn'I!�[PUrNg1�N� Mk��,N/�l1fN/�1Y► �J1,11.1t.� M, GI{D]�, �A't1 D Corp(jll� <br /> f3.1t% kL i_R)tYA0 �iiK%1 1 Lbir,- d, 1L[�{1�,1k"aA?c +� SAOIC F'9bU5n 319S4ms 1 <br /> U1W 11fJ hrtL SQL 1, P�o���t WOQXa <br /> �� MW4 sat, NLL <br /> • UM tuft, LM, W1G ai 7Afvt, iL,tt WP' I ffik n OI!_. <br /> SD�L ArC 1= Eo` hGS. SAmPUNtl ;DIL 44 <br /> [W-(-,ft 0( 'I'1' % canJStt�t , ,� A4ea�ry �� <br />
The URL can be used to link to this page
Your browser does not support the video tag.