Laserfiche WebLink
Mr Don Rodgers Proposal P96-050 31 <br />. May 14, 1996 <br /> Page 5 <br /> Based on the analytical results, and assuming the water will be classifted as <br /> nonhazardous, the water generated from the dulling activities and development will be <br /> disposed of at a recycling facility <br /> Task 3 - Quarterly Groundwater Monitoring and Reporting <br /> EMCON will conduct four quarters of groundwater monitoring of the newly installed <br /> monitoring well(s) Quarterly groundwater monitoring consists of measuring groundwater <br /> elevations, measuring free product thickness (if present), collecting samples from the <br /> groundwater monitonng well(s) once per quarter, and submitting groundwater sample(s) <br /> to a state-certified laboratory for analysis of TPHG and BTEX In addition, MTBE will <br /> be analyzed dunng the initial sampling event If MTBE is not detected in the groundwater <br /> sample(s) dunng the initial sampling event, MTBE analyses will be discontinued <br /> Groundwater samples will also be analyzed for CLHC on a semi-annual basis Based on <br /> analytical results, and assuming the water will be classified as nonhazardous, the water <br /> will be disposed of at a recycling facility twice per year during the quarterly monitoring <br /> program <br /> In addition to the groundwater monitonng, EMCON will prepare and submit quarterly <br /> groundwater monitoring reports to Mr. Rodgers and the regulatory agencies The report <br /> will include the tabulated depth to water measurements and analytical results from the <br /> sampling of the monitonng well(s), gradient and direction of groundwater flow beneath <br /> the site, and expected status of the site acts%ittes <br /> Task 4 - Prepare A Corrective Action Plan <br /> EMCON will prepare a CAP The report w ill summarize the results of the investigation <br /> The report will present concentrations and distribution of petroleum hydrocarbons in soli <br /> and groundwater beneath the site In addition, the CAP will address both soil and <br /> groundwater remediation as descnbed in the CRWQCB's Tn-Regional Guidelines and <br /> will provide a basis for obtaining bids for final remediation for the site <br /> OPTIONAL UNIT TASKS (NOT INCLUDED IN TOTAL COST) <br /> The following section presents optional unit tasks in the event that additional bonngs, <br /> vapor extractions wells, etc are required to define the extent of contamination or to <br /> prepare for feasibility studies Summary of unit costs are presented in Table 3 In <br /> addition, EMCON has prepared unit cost prices to perforin a vapor extraction test The <br /> following activities will not be implemented without the approval of Mr Rodgers <br /> SACT,XP96-050 31-95�drns <br />