- 0 - <br /> Ms <br /> -Ms Lori Duncan Project 880-039 1A <br /> March 13, 2002 <br />�r Page 5 <br /> Well Surveying <br /> ' Upon completion of well construction, the wells will be surveyed by a licensed surveyor <br /> for location and elevation relative to mean sea level Groundwater gradient will be <br /> interpreted utilizing wellhead elevations and depths to water <br /> Soil Cuttings and Purge Water <br /> Soil cuttings generated during drilling operations will be temporarily stored on site in <br /> DOT approved 55-gallon drums pending characterization A California-certified disposal <br /> contractor will remove soil cuttings to an appropriate disposal facility Water generated <br /> during steam cleaning, development, and sampling of wells will be temporarily stored in <br /> DOT-approved 55-gallon drums pending transport by the disposal contractor to an <br /> appropriate disposal or treatment facility <br /> Technical Report <br /> Following the completion of the well/boring installations, IT will prepare a report <br /> summarizing the procedures, field results, and analytical results The report will include <br /> an evaluation of current site conditions and recommendations for additional work if <br /> jappropriate <br /> SCHEDULE <br /> IT is prepared to initiate the well/boring installations upon approval from the <br /> SJCPHS/EHD Once approval is granted, IT will submit a pre-approval to the <br /> Underground Storage Tank Fund, submit the welliboring permits to the SJCPHSIEHD and <br /> schedule the work with the subcontractors IT anticipates this process will require <br /> approximately one month to complete following work plan approval <br /> SAC 111SACRFPIICOMMONIsacDP120021PRJ1PJ8188018800391A tab doc f T CORPORA TION <br /> (01020000) <br />