Laserfiche WebLink
' Mr John Benedict Project 880039 <br /> October 17, 2000 <br /> • Page 4 <br /> IT will continue to perform quarterly groundwater sampling The next sampling: event is <br />' tentatively scheduled for November 2000 IT will continue soil vapor extraction (SVE) system <br /> O&M O&M site visits will occur weekly and compliance sampling will continue to occur <br /> monthly <br />' Please call if you have questions regarding this report or any aspect of the project <br />' Sincerely, <br /> IT CORP ON <br /> 40w <br /> Mark Ca s eG 6561 Tom A an <br /> 1 pp <br /> Project Geologist Proje Ay <br /> Engineer <br /> 1 <br /> Attachments Table 1 Groundwater Monitoring Data <br />' Figure 1 Site Location Map <br /> . Figure 2 Generalized Site Plan <br /> Appendix A Groundwater Monitoring Field Data Sheets <br />' Appendix B Groundwater Sampling and Analysis Procedures <br /> Appendix C Groundwater Chain-of-Custody Records and Laboratory <br /> Analysis Reports <br />' Appendix D Treatment System O&M Field Sheets, Laboratory Reports <br /> and O&M Tables <br /> Appendix E Calculations <br /> 1 cc Ron Rowe, San Joaquin County Public Health Services <br /> Mark List, California Regional Water Quality Control Board <br />' Don Rodgers, The Transmission Shop <br /> Linda Sanborn, California UST Cleanup Fund Program <br /> 1 <br /> 1 <br /> SAC\\\SACRFPI\COMMON\Consulting\data\Shared\Projects\misc\8800391A ab doe-00\ta 1 rrcop"►mnon <br /> (01010000) <br />