Laserfiche WebLink
r n <br /> Mr Don Rodgers Project 792774 01000000 <br /> i January 28, 2000 <br /> Page 3 <br /> REMEDIATION SYSTEM STATUS FOURTH QUARTER 1999 <br /> The San Joaquin Valley Air Pollution Control District issued the permit to operate PG&E has not <br /> completed the electrical service drop to the system PG&E expects to complete this by February <br /> 2000, and the system startup and source test will be conducted after electrical service Installation is <br /> completed <br /> CONCLUSIONS <br /> Analytical results of petroleum hydrocarbons were generally consistent with previous sampling <br /> events Groundwater elevation decreased 018 foot from the previous sampling event (August <br /> 1999) - i <br /> IT will continue to perform quarterly groundwater sampling The next sampling event is <br /> tentatively scheduled for February 2000 The SVE system will begin operation upon receipt of <br /> the permit to operate <br /> Please call if you have questions regarding this report or any aspect of the project <br /> Sincerely, <br /> IT Corporation <br /> S <br /> Mark Capps, R G 6561 Jo 1 offman <br /> Project Geologist Sen r Project Supervisor <br /> Attachments Table 1 Groundwater Monitoring Data <br /> Figure 1 Site Location Map <br /> Figure 2 Generalized Site Plan <br /> Appendix A Groundwater Monitoring Field Data Sheets <br /> Appendix B Sampling and Analysis Procedures <br /> Appendix C Chain-o€-Custody Records and Laboratory Analysis Reports <br /> cc Ron Rowe, San Joaquin County Public Health Services <br /> Mark List, California Regional Water Quality Control Board <br /> California UST Cleanup Fund Program <br /> CIBC 1Axhive\Rodgers\QtrlyIRDGRQ499 doc-981%1 IT Corporation <br />