Laserfiche WebLink
t <br /> . Mr Don Rodgers Project 792774 01000000 <br /> November 19, 1999 <br /> Page 3 <br /> REMEDIATION SYSTEM STATUS: THIRD QUARTER 1999 <br /> System start-up will occur once the approved permit to operate is received from the San Joaquin <br /> Valley Air Pollution Control District IT submitted the Authority to Construct (ATC) permit during <br /> the third quarter 1998 However, since the site is located within 1,000 feet of a school, public <br /> notification is required <br /> CONCLUSIONS <br /> Analytical results of petroleum hydrocarbons were generally consistent with previous sampling <br /> events Groundwater elevation increased 0 35 foot from the previous sampling event (November <br /> 1998) <br /> IT will continue to perform quarterly groundwater sampling The next sampling event is <br /> tentatively scheduled for November 1999 The SVE system will begin operation upon receipt of <br /> the ATC permit <br />. Please call if you have questions regarding this report or any aspect of the project <br /> Sincerely, <br /> IT Corporation <br /> Mark Capps, G 6561 J 1 Coffman <br /> Project Geologist Senior Project Supervisor <br /> Attachments Table 1 Groundwater Monitoring Data <br /> Figure 1 Site Location Map <br /> Figure 2 Generalized Site Plan <br /> Appendix A Groundwater Monitoring Field Data Sheets <br /> Appendix B Sampling and Analysis Procedures <br /> Appendix C Chain-of-Custody Records and Laboratory Analysis Reports <br /> cc (Ron Rowe, San Joaquin County Public Health Services <br /> Elizabeth Thayer, California Regional Water Quality Control Board <br /> California UST Cleanup Fund Program <br /> MC\Archrve�Rodgers%Qtr1y\RDGRQ399 doc-981jsg i rr Corporation <br />