My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
E
>
EL DORADO
>
3707
>
2900 - Site Mitigation Program
>
PR0506536
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/4/2019 2:23:04 PM
Creation date
3/4/2019 1:45:46 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
WORK PLANS
RECORD_ID
PR0506536
PE
2950
FACILITY_ID
FA0007483
FACILITY_NAME
TAFT DETENTION BASIN
STREET_NUMBER
3707
Direction
S
STREET_NAME
EL DORADO
STREET_TYPE
ST
City
STOCKTON
Zip
95206
CURRENT_STATUS
02
SITE_LOCATION
3707 S EL DORADO ST
P_LOCATION
01
QC Status
Approved
Scanner
TMorelli
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
24
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
FIELD PROCEDURES <br /> Site Safety Plan <br /> This plan describes the safety requirements for field work performed at the site. The site <br /> safety plan is applicable to personnel of Smith Technology Corporation who perform the field <br /> work. A copy of the site safety plan is available for reference by appropriate parties during <br /> the work. The onsite representative of Smith Technology acts as the Site Safety Officer. <br /> Drilling Methods <br /> Before drilling begins, Smith Technology notifies Underground Service Alert so that <br /> approximate locations of underground utility lines and structures can be marked. The soil <br /> borings are started by hand-angering or probing to a depth of 3 to 5 feet to minimize the <br /> possibility of damaging underground utilities. <br /> Borings are drilled with a CME 55 or similar drill rig equipped with continuous-flight, hollow- <br /> stem augers. The augers are steam-cleaned before use in each boring to minimize cross- <br /> contamination of the borings. The drill cuttings are stored in Department of Transportation <br /> (DOT) 55-gallon drums or stockpiled onsite and covered with plastic pending disposal at an <br /> appropriate disposal facility. <br /> Soil Sampling in Borings <br /> Soil samples for analysis and identification are collected at approximately 5-foot intervals from <br /> the borings during drilling. Soil samples are collected by advancing the boring to a point just <br /> above the sampling depth and then driving a California-modified, split-spoon sampler <br /> containing clean brass sleeves through the hollow center of the auger into the soil. The <br /> sampler is driven 18 inches with a standard 140-pound hammer repeatedly dropped 30 inches. <br /> The number of blows needed to drive the sampler each successive 6 inches is counted and <br /> recorded to evaluate the relative consistency of the soil. Sampling equipment is cleaned <br /> between each use with an industrial non-phosphate soap and clean tap water. <br /> Soil Sample Labeling and Handling <br /> The soil samples selected for possible laboratory analysis are removed from the sampler and <br /> quickly sealed in their brass sleeves with Teflon tape and plastic caps. The respective sample <br /> containers are labeled in the field with the job number, sample location and depth, and date, <br /> and promptly placed in iced storage for transport to the laboratory. Chain of Custody Records <br /> are initiated in the field by the technician and accompany the samples to a laboratory certified <br /> by the State of California to perform the requested analyses. <br /> SHELLS\FLDMTHDS.doc 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.