Laserfiche WebLink
promptly placed In iced storage for transport to the laboratory Chain-of-custody records were <br />'16 initiated In the field by the geologist and accompanied the samples to a Iaboratory certified by the <br /> state of California to perform the analyses requested <br /> Monitoring Well Construction <br /> The monitoring well was constructed in the boring with thread-jointed, 4-Inch-inner-diameter, <br /> Schedule 40 polyvinyl chloride (PVC) casing No chelrucal cements, glues, or solvents were used <br /> In well construction The screened portion of the well consisted of factory perforated casing with <br /> 0 020-inch-wide slots The well screen extends from the total depth of the well to approximately <br /> 5 feet above the groundwater surface The annular space In the well was packed with number 3 <br /> sand to approximately 2 5 feet above the slotted interval A 3- to 5-foot-thick bentonite plug was <br /> added above the sand pack to prevent the cement from entering the Ezell pack The remaining <br /> annulus was backfilled to grade with neat cement or a bentonite cement grout See Appendix B <br /> for logs of exploratory borings <br /> The well was protected with a traffic-rated, cast-aluminum utility box equipped with a metal skirt <br /> The box has a watertight seal to protect against surface water infiltration The design of this box <br /> d.lscourages vandalism and reduces the possibility of accidental disturbance of the well <br /> Vapor Extraction Well Construction <br /> The vapor extraction wells was constructed in the boring with thread-bunted, <br /> 2-Inch-Inner-diameter, Schedule 40 PVC casing No chemical cements. glues, or solvents were <br /> used in well construction The screened portion of the well consisted of factory perforated casuig <br /> t with 0 020-inch-wide slots The annular space in the deep well was packed with number 3 sand to <br /> approximately 1 foot above the slotted interval A 3-foot-thick bentonite plug was added above <br /> the sand pack The remaining annulus was backfilled to grade with neat cement grout The dual <br /> completion well consisted of two 2-inch diameter PVC casings In a 8-foot-diameter borehole The <br /> casings were screened at two separate intervals to allow for a larger coverage area The annular <br /> space around the deep casing was then packed with number 3 sand to approximately 1 foot above <br /> the slotted interval Number 3 sand was placed on the bentonite seal to a depth of approximately <br /> 1 foot, and the shallow casing was placed on the sand The annular space around the shallow <br /> ' casing was then packed with number 3 sand to approximately 1 foot above the slotted interval A <br /> 3-foot-thick bentonite plug was added to prevent the cement grout from entering the well pack <br /> The remaining annulus was backfilled to grade with neat cement grout See Appendix B for well <br /> ' details sheets <br /> The well was protected with a traffic-rated, cast-aluminum utility box equipped with a metal skirt <br /> ' The box has a watertight seal to protect against surface water infiltration The design of this box <br /> discourages vandalism and reduces the possibility of accidental disturbance of the well <br /> SAC\N\P72\2613Q613IOW 1BB-95\1162 A-2 Rev 0 2!5197 <br /> 22613-100 001 <br />