My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS XR0001188
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
C
>
CHARTER
>
515
>
2900 - Site Mitigation Program
>
PR0527799
>
ARCHIVED REPORTS XR0001188
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/4/2019 3:56:40 PM
Creation date
3/4/2019 1:46:36 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0001188
RECORD_ID
PR0527799
PE
2960
FACILITY_ID
FA0018844
FACILITY_NAME
TRANSMISSION STORE
STREET_NUMBER
515
Direction
W
STREET_NAME
CHARTER
STREET_TYPE
WAY
City
STOCKTON
Zip
95206
APN
14707408
CURRENT_STATUS
01
SITE_LOCATION
515 W CHARTER WAY
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
WNg
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
182
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
LOG OF EXPLORATORY BORING <br /> PROJECT NUMBER 2613-100 001 BORING NO B6R/V«4 <br /> PROJECT NAME Transmission Shop, 515 West Charter Way, Stockton, CA PAGE 2 OF 2 <br /> BY C Avila DATE 10/11/96 SURFACE ELEV 9 3 ft <br />' LURECOVERY PID PENETRA- V) LITHO- WELL F10N J J <br /> LV GRAPHIC DESCRIPTION DETAIL <br /> �qW W� <C COLUMN <br /> (ft/ft) (ppm) (btws/ft) cD�_j <br /> 10/10 0 SILTY CLAY (CL), continued <br /> r <br /> 1 <br /> 1 011 0 35 25 Q24 5' SILT olive green, non plastic, trace fine <br /> grained sand, dry <br /> 1 <br /> SILTY SAND(SM) olive green wet moderate <br /> hydrocarbon odor <br /> 30 <br /> 7 <br /> 10/11/96 <br /> 1 <br /> 35 035' as above <br /> SAND(SP), olive green, fine grained sand, wet <br /> 1 <br /> r <br /> 40 BORING TERMINATED AT 40 0 FEET <br /> REMARKS <br /> Boring drilled using S-mch diameter continuous flight hollow-stem auger drilling equipment and sampled with a <br /> modified California split-spoon sampler Sampler driven using air hammer Boring convened to a 2-inch diameter <br /> EOOINSvapor extraction cell See Well Details sheet for well construction information <br /> E ON <br /> 1 <br /> { <br />
The URL can be used to link to this page
Your browser does not support the video tag.