My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS XR0001189
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
C
>
CHARTER
>
515
>
2900 - Site Mitigation Program
>
PR0527799
>
ARCHIVED REPORTS XR0001189
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/4/2019 7:46:01 PM
Creation date
3/4/2019 1:48:26 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0001189
RECORD_ID
PR0527799
PE
2960
FACILITY_ID
FA0018844
FACILITY_NAME
TRANSMISSION STORE
STREET_NUMBER
515
Direction
W
STREET_NAME
CHARTER
STREET_TYPE
WAY
City
STOCKTON
Zip
95206
APN
14707408
CURRENT_STATUS
01
SITE_LOCATION
515 W CHARTER WAY
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
WNg
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
119
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Mr Tom Busenbark Project No 880-039 IA <br /> January 29, 2003 <br /> Page 5 <br /> Fourth Quarter 2002 System Performance Summary <br /> 1 Pounds TPH-g removed since startup 3,165 <br /> Pounds TPH-g removed during this reporting period 102 <br /> TPH-g daily removal rate during reporting period(pounds per day) 17 <br /> TPH-g destruction efficiency(%) 93 3 to 99 7 <br /> TPH-g emission rate to atmosphere(pounds per day) <1 65 <br /> Pounds benzene removed since startup 45 <br /> Pounds benzene removed during this reporting period <01 <br /> Benzene Destruction Efficiency(%) 100 <br /> Benzene emission rate to atmosphere(pounds per day) <0 0009 <br /> Average flow rate for this reporting period(scfm) 39 <br /> System uptime during this reporting period(days/%) 60 days/66% <br /> CONCLUSIONS <br /> Analytical results of groundwater samples collected from the site were generally consistent <br /> with previous sampling events Groundwater elevation decreased between 0 65 to 106 feet <br /> from the previous sampling event (August 23, 2002) The observed groundwater gradient <br /> during the fourth quarter 2002 was 0 006, with flow to the east Petroleum hydrocarbon <br /> concentrations have generally increased since the first quarter 2002 Graphs showing <br /> TPH-g, benzene, MTBE concentrations, and groundwater elevations versus time in wells <br /> MW-1R, VW-2, and VW-3 are presented in Appendix E <br /> Approximately 102 pounds of TPH-g and less than 0 1 pounds of benzene were removed <br /> during the fourth quarter 2002 The system performed in compliance with permit <br /> requirements Pulsed operation of the SVE system began in the second quarter 2002, and <br /> continued during the fourth quarter 2002 <br /> ' Shaw will continue to perform quarterly groundwater sampling The next sampling <br /> event is tentatively scheduled for February 2003 <br /> N\sacDP120031Prj\88018800391A 3aa doc Shaw Environmental, Inc <br /> (01050000) <br />
The URL can be used to link to this page
Your browser does not support the video tag.