My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS XR0001191
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
C
>
CHARTER
>
515
>
2900 - Site Mitigation Program
>
PR0527799
>
ARCHIVED REPORTS XR0001191
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/4/2019 8:01:23 PM
Creation date
3/4/2019 1:50:33 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0001191
RECORD_ID
PR0527799
PE
2960
FACILITY_ID
FA0018844
FACILITY_NAME
TRANSMISSION STORE
STREET_NUMBER
515
Direction
W
STREET_NAME
CHARTER
STREET_TYPE
WAY
City
STOCKTON
Zip
95206
APN
14707408
CURRENT_STATUS
01
SITE_LOCATION
515 W CHARTER WAY
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
WNg
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
108
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Mr John Benedict Project No 880-039 IA <br /> July 25, 2002 <br /> Page 5 <br /> CONCLUSIONS <br /> Analytical results of collected groundwater samples from the site were generally consistent with <br /> previous sampling events Groundwater elevation decreased between 0 03 and 0 15 feet from the <br /> previous sampling event (February 22, 2002) The observed groundwater gradient during the <br /> second quarter 2002 was 0 006 fl/ft to the north-northwest Petroleum hydrocarbon concentrations <br /> have increased since the first quarter 2002 but are still within historical levels Graphs showing <br /> TPHG, benzene, MTBE concentrations, and groundwater elevations versus time in onsite wells <br /> are presented in Appendix E <br /> Approximately 26 pounds of TPH-g and 0 04 pounds of benzene were removed during the second <br /> quarter 2002 The system performed in compliance with permit requirements Pulsed operation of <br /> the soil vapor extraction system was begun in the second quarter 2002 and will continue through the <br /> third quarter 2002 <br /> Shaw E & I will continue to perform quarterly groundwater sampling The next sampling event <br /> is tentatively scheduled for September 2002 <br /> Please call Kathleen Waldo at (916) 565-4370, if you have questions regarding this report or any <br /> aspect of the project <br /> Sincerely, <br /> SHAW ENVIRONMENTAL& INFRASTRUCTURE, INC <br /> Martin Mi G, RGP Kathleen A Waldo <br /> Project Geologist Y Staff Engineer <br /> MARTIN J } <br /> MEI. <br /> s, <br /> NO 6088 <br /> 11SACRFP 1ICO MMON1sacDP120021PRJIPJ8\880\8800391A tae(10L <br />
The URL can be used to link to this page
Your browser does not support the video tag.