Laserfiche WebLink
1 <br /> l <br /> Mr John Benedict Project 880039 lA <br /> ie April 19, 2001 <br /> Page 5 <br /> than 0 0002 to 0 0011 pounds per day,demonstrating the system is operating consistent with permit <br />' requirements <br /> IT will continue to perform quarterly groundwater sampling The next sampling event is <br />' tentatively scheduled for May 2001 IT will continue soil vapor extraction system O&M O&M <br /> site visits will occur weekly and compliance sampling will continue to occur monthly <br />' Please call if you have questions regarding this report or any aspect of the project <br /> Sincerely, <br /> IT CORPORATION <br /> Mark Cap ,R G 6561 Tom A <br />' Project Geologist Project Engineer <br /> Attachments Table l Groundwater Monitoring Data <br /> Figure 1 Site Location Map <br /> Figure 2 Generalized Site Plan <br /> Appendix A Groundwater Monitoring Field Data Sheets <br /> Appendix B Groundwater Sampling and Analysis Procedures <br />' Appendix C Groundwater Chain-of-Custody Records and Laboratory <br /> Analysis Reports <br /> Appendix D Treatment System O&M Field Sheets, Laboratory Analytical <br />' Reports, Chain of Custody Documentation, System O&M Tables, <br /> and Emission Calculations <br />' cc Lori Duncan, San Joaquin County Public Health Services <br /> Mark List, California Regional Water Quality Control Board <br /> Don Rodgers, The Transmission Shop <br />' Linda Sanborn, California UST Cleanup Fund Program <br /> 1 <br /> IT CORPORATION <br /> SAC WlrancfpllP%lectslProjects1880103911A1Quarterlys11g01 doe-Mit 3 <br /> (01010000) <br />