My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SITE INFORMATION AND CORRESPONDENCE FILE 2
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
D
>
DR MARTIN LUTHER KING JR
>
620
>
3500 - Local Oversight Program
>
PR0544216
>
SITE INFORMATION AND CORRESPONDENCE FILE 2
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/4/2019 6:55:51 PM
Creation date
3/4/2019 2:20:31 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
SITE INFORMATION AND CORRESPONDENCE
FileName_PostFix
FILE 2
RECORD_ID
PR0544216
PE
3528
FACILITY_ID
FA0003738
FACILITY_NAME
CHARTER WAY SHELL*
STREET_NUMBER
620
Direction
W
STREET_NAME
DR MARTIN LUTHER KING JR
STREET_TYPE
BLVD
City
Stockton
Zip
95206
APN
16504007
CURRENT_STATUS
02
SITE_LOCATION
620 W DR MARTIN LUTHER KING JR BLVD
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
WNg
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
415
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
� r i <br /> Mope <br /> UNIT IV LOP <br /> LTCP NO FURTHER ACTION (NFA)CLOSURE CHECK LIST <br /> , --// 8/20/13 <br /> SITE ADDRESS: G.Lo ���YfGr "ts DATE: 11_ Z6 - �3 <br /> SITE NAME: SPX VS';e _+AWA-d>-c LOP STAFF: (^�t�L i Ind'e&t f, <br /> /0REQUEST FOR CLOSURE(AKA NFA) up loaded into GT by RP/consultant, within 60 days LOP staff reviews and <br /> 7receipts <br /> ESI with link to regulator's response in GT. If Staff verifies site meets LTCP closure criteria, then gain PG's <br /> concurrence. PG saves LTCP check list as"FINAL","READY/ELIGIBLE FOR CLOSURE"in GT. <br /> LOP Staff verified GeoTracker(GT)"Closure Review" screen still marked "No" at"Is This Case Ready for Closure?" <br /> OP Staff advises CVRWQCB of NFA consideration to prepare for Unit meeting. <br /> LOP Staff asks RP consultant's for Tri-Regional Appendix A submittals to GT of: Time to reach WQG, Initial and <br /> removed mass estimates, soil vapor study(if applicable). Submittals received on: RB notified on <br /> 11-.26-/SLOP staff and PG/PC discuss NFA and LTCP READY FOR CLOSURE consideration with CVRWQCB at Unit Meeting, <br /> by phone, or e-mail. RB informally concurs on/l- 2s-13/RB requires: S Ile�o+rtel..� w concur <br /> / / <br /> L � to concur w/closure. <br /> • I-30•/4! V1&, <br /> /1 •/ LOP Staff drafts Case Closure Summary(CCS) and CCS is reviewed by`third party' staff member: vi o+ ad o Yl� <br /> LOP Staff prepares 30-day notification letter to CVRWQCB of intention to issue an NFA that includes the CCS. <br /> LOP Staff submits 30-day CVRWQCB letter /QCS and file to PC for review and signature. <br /> CVRWQCB 30-day response date up on: doncurrence received on: RB requests extension <br /> to: Non-concurrence letter from C R CB Management received on: Staff up loads EHD letter <br /> to CVRWQCB without CCS and CVRWQCB concurrence for closure letter in GT on <br /> / zG / Staff or consultant prepares 60 day Public Participation Notice(PPN). <br /> /.J r�Inalized PPN sent/posted notifying effected properties and adjacent properties. 60 days upon 3 2-4 <br /> jPPN sent to sdse/ktLcity/county Building Dept& <br /> Ch !�/�t� water purveyor. 60 days up on 3 L4 l <br /> Name&Address list of all recipients(confidential) and PPN filed in LOP file. PPN up loaded into GT on / /JL <br /> 3 f 3///c1 Documentation received, filed, and flagged that indicates the"current record owner(s) of fee title to the site have <br /> T•-7Tr been notified", per Section 25297.15 (a). The NFA closure letter may not be issued without this documentation. <br /> -f 3 //v/ <br /> OP Staff directs RP to destroy all MWs, remove all waste material & provide docum ntation of proper waste <br /> disposal. LOP staff reviews and approves work plan for well destruction. S-2�� <br /> MW Destruction permits issued (after 60 days of PPN)&Johnny notified of impending work. <br /> -7W14LOP Staff documents destruction of all MW. GT"Groundwater Monitoring" screen updated to indicate wells are <br /> destroyed. The NFA closure letter may not be issued until MWs are destroyed. <br /> Cd1 LOP Staff verifies and flags documentation received indicating all onsite waste material removed and properly <br /> disposed and verified with EHD accounting all & t fees hay aid. The NFA closure letter may <br /> not be issued without this documentation. T"Closure Review" screen mar ed"Yes" at"Is This Case Ready <br /> yA <br /> for Closure?" <br /> LOP Staff asks clerical to prepare NFA& CCS for Director's signature within 30 days of MW destroyed and <br /> waste material properly disposed, & provides RPs name and addresses to be sent original NFA. PG/PC <br /> reviews file with flagged documents and approves issuance of NFA letter by Director. Signed CCS and NFA <br /> are copied. Originals mailed to RPs. Copies filed into LOP File, PC, and staff to upload into GT. <br /> C�/y5/1 Clerical staff updates Envision to reflect site is Closed. <br /> 11040 LOP staff pulls all site files for clerical staff to file in LOP Closed File cabinets, until scanned into Questys. <br /> LOP staff updates GT"Project Information" screens to reflect site status as Closed. <br />
The URL can be used to link to this page
Your browser does not support the video tag.