|
1 e t
<br />"''°' ,r+�'i!Y x •` i r.7 x`'r u^�`L" ��I irk'� ,.�-r'�r+ •.-�'� s• 1 u-'"w'C�y ��rer� r.a3� -
<br /> y r w,.:-.:p , ,� A• ':'�,1 yy °,;y•? Y w x.w �jL. ! �` 7^�'9e �' :rwF �a-v
<br /> ";1'Er��„} � ��i�+n54. ti.i., , „i .r7,x.� ��m.,'^`a, '..�' elf Thr ,;y.„R .,� 1{� 77}^ >?r"'�-�'{� � F�1 rr� ..}� �`•4`w.. � 7 'e :
<br /> � '`
<br /> {l�-�rht. �., i •,�'•r•l� �'r. �>lt� !r`�? ,��.`�.� ^LiGe't"�`^F�" Fi'�
<br /> ,r 1•k
<br /> "r APPENDU A
<br /> Mrthvd., t,Ayllc.l Procedure,,
<br /> Qttal;ty+durance Plan,and
<br /> Site s4faty plan
<br /> Paga Ds
<br /> 1
<br /> i A liquid sample wilt then
<br /> bailer, be collected from each well with a laboratory-cleaned
<br /> s Each Sample will be appropriately labelo� ice from the timedic codli teflon
<br /> o ion
<br /> through the time of dclive ed and stored
<br /> rY to the laborat ,
<br /> laboratory and analyzed Ground waver samples will be transported to
<br /> u ii�tin the orY EPA-specified holding times for the requested anal
<br /> i y yses.
<br /> I 4e z �
<br /> LA
<br /> r This section describes the field and analytical procedures to be followed throughout the investigation,
<br /> gation.
<br /> n rn!, rn 1 li i n un Hnn Iln pr ur
<br /> 1 Proper collection and handling are essential to ensure the quality
<br /> collected in a suitable container, q tY of a Sample'Preserved of
<br /> for the intended anal 'Each sample wall be
<br /> analysis for no longer than the maximum analysis, and stared prior tp
<br /> collection and handlingof s =t allowable holding time. Details On Arid ground water samples to be used on this project Canrbeefound dure f in
<br /> Section 1.0.
<br /> r
<br /> N 2 2 am l l •n ill I n n hnln- T- tt
<br /> ! , Sample identification and chain-Of-custody procedures ensure sample Integrity and document sample
<br /> possession from the time of collection to its ultimate disposal. Each sample container submitted for
<br /> � analysis will have z
<br /> lobel affixed to identify the job nurnber, sampler, date and time of sample
<br /> collection,and a sample number unique to that sample. Thi,infoemat;an,in addition to a description
<br /> of tate sample,field measurements made,samplin Ple- T'olo
<br /> i other pertinent field observations wall be recorded on the borehole to
<br /> 8Y,names of on-site personnel,and any
<br /> samples will be analyz ,J by a Califoritia-certified laboratory, 8 or in file field records, Ali
<br /> r,.
<br /> Achain-of-custody farm will be used to record possession of the sample from time of collection t
<br /> its arrival at the laboratory. When the samples are
<br /> relinquish the samples by signingShipped, the person in custodyo
<br /> the chain-of-custody form and noting of meet. will
<br /> sample control officer will veriF p g the Limeshipment.
<br /> � y sam !e integrity and confirm that it was collectted , he proper
<br /> container, preserved correctly, and that there is an adequate volume for analysis.
<br /> rY
<br /> Y
<br />
|