My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS XR0012563
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
D
>
DR MARTIN LUTHER KING JR
>
620
>
3500 - Local Oversight Program
>
PR0544216
>
ARCHIVED REPORTS XR0012563
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/5/2019 1:33:30 AM
Creation date
3/4/2019 2:42:56 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0012563
RECORD_ID
PR0544216
PE
3528
FACILITY_ID
FA0003738
FACILITY_NAME
CHARTER WAY SHELL*
STREET_NUMBER
620
Direction
W
STREET_NAME
DR MARTIN LUTHER KING JR
STREET_TYPE
BLVD
City
Stockton
Zip
95206
APN
16504007
CURRENT_STATUS
02
SITE_LOCATION
620 W DR MARTIN LUTHER KING JR BLVD
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
WNg
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
982
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
e�G <br /> i <br /> APPENDIX D <br /> Methods,Analytical Procedure, j. <br /> Quality Auurance Plan,and <br /> k Site Safety Plan <br /> Pup DS <br /> t <br /> g� r <br /> �. J.0 SITE SAEETY PLAN <br /> .s <br /> This plan addresses safety provisions to be employed during the site investigative filed work in the <br /> vicinity of 620 West Charter Way, Stockton, California. The objective of the plan is to describe <br /> procedures and actions to protect the worker, as well as uninvolved parties, from inhalation and 1. <br /> ingestion of,and direct skin contact with,potentially hazardous materials that may be encountered <br /> 1 ' at the site. The plan describes(1)personnel responsibilities,and(2)protective equipment to be worn <br /> as appropriate when working on the sits. <br /> 3,1Personnel ResDgnsibilities F <br /> F Key personnel directly involved in the investigation who will be responsible for monitoring the <br /> l; execution of safe work practices and the provisions of this plan are:(1)the drilling-subcontractor <br /> project supervisor and (2) the Delta project field manager. These personnel are responsible for <br /> knowing the provisions of the plan, communicating plan requirements to workers under their `- <br /> ls r <br /> supervision and to site visitors, and fcr enforcing the plan. <br /> E The designated personnel-protective equipment is selected to prevent filed personnel from exposure <br /> a to gasoline fuel products that may be present at the site. To prevent direct skin contact, the <br /> following protective clothing will be worn as appropriate while working at the site: <br /> tf <br /> 1. Hard hat with optional face shield. <br /> l <br /> c : 2. Trvek coveralls <br /> 3. Butyl rubber or disposable vinyl gloves s <br /> " 4. Steel toe boots <br /> F 5. Goggles or safety glasses(if optional faze shield not used on the hard hat) i <br /> fn 'l <br /> The type of gloves used will be determined by the type of work being performed. Drilling personnel i <br /> b.. will be required to wear butyl rubber gloves because they will have long-duration contact with the <br /> subsurface materials. Delta sampling personnel will wear disposable gloves when handling any <br /> sample. These gloves will be changed between each sample. <br /> l. <br /> s <br /> h <br /> 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.