Laserfiche WebLink
zw <br /> Ms. Linda Turkatte <br /> August 22,1991 <br /> Page 4 <br /> Future Work <br /> Delta will continue to perform quarterly sampling of the ground water monitoring wells. The next <br /> sampling event is scheduled for actbl�ei 1f <br /> Delta has rc--,cved approval from the San Joaquin County Department of Health Services to proceed <br /> with construction Of a ground water remediation system. Installation or the remediation system will be <br /> performed as soon as possible. Free product recovery pumps installed in monitoring wells MW-2 and <br /> MW-7 will continue to operate and monitoring well MW-4 will be hand-bailed bimonthly until <br /> installation of the remediation system. <br /> If you have questions regarding this letter report, please call Rich Chandler or Henry Dihm <br /> at(916)633-2(185. <br /> Sincerely, <br /> 1)u, ,rA ENVIRONF.­.ENTAL CONSULTANTS, INC. <br /> ichard E Chandler U <br /> Hydrogeologist <br /> 53 <br /> 41f'j Ua <br /> Jame,R.Brownell, R.G. 46 NO.51078 <br /> Hy6rogeologist <br /> HAD:HJM:jdm(QMR001JDM) LOP <br /> Enclosures 4slor. %Ve N_ <br /> i <br /> cc/enc: Mr.Jack brastad,Shell Oil Company Water Quality Control Board <br /> Mr.Jim Maughan,Central Valicy Regional <br />