Laserfiche WebLink
�.. p <br /> kj <br /> b <br /> Ms Diane Hinson <br /> April 13, 1990 <br /> f k` Page 4 <br /> is . i'he data from the ground water pamping and vapor extraction tests are currently being <br /> l analyzed,and a remedial action plan is being developed which will define the flow rates and <br /> eq®ip:ment required to implement final remedial action at the sit,"— <br /> * <br /> ir,-• The proposed implementation schedule is enclosed. <br /> f Following completion of additional monitoring wen installation, a Problem Assessment Report will <br /> be prepared detalling the results of the hydrogeologic assessment znd the definition of the dissolved <br /> hydrocarbon plume. <br /> if you have any questions regarding this project,please contact Erin Dougherty at (916) 638.2085. <br /> Sincerely, <br /> j DELTA E.NWRONMENTAL CONSULTANTS,INC. <br /> Michael M. Westerheim,P.E. <br /> Project Engineer <br /> It j� <br /> Erin Dougherty v <br /> Project Manager <br /> !`r fAMW:ED:ecd <br /> Enclosures <br /> Ij <br /> r. cc,enc: Ms.Diane Lundquist,Shell Oil Compaty <br />