Laserfiche WebLink
:• A M B R I A Ms Vida McCartney <br /> January 10,2006 <br /> ANTICIPATED FIRST QUARTER 2006 ACTIVITIES <br /> Groundwater Monitoring: Blaine will gauge and sample the site wells according to the existing <br /> sampling schedule and tabulate the data Shell will submit a groundwater monitoring report <br /> Site Investigation Shell will submit a report summarizing the CPT investigation under separate <br /> cover <br /> HISTORICAL REMEDIATION SUMMARY <br /> A soil vapor extraction (SVE) system operated at this site from September 1992 to <br /> November 1996 During this time, the SVE system removed approximately 17,628 pounds of <br /> vapor-phase total petroleum hydrocarbons as gasoline from the subsurface <br /> CLOSING <br /> I <br /> If you have any questions regarding the contents of this document, please call Aubrey Cool at <br /> i <br /> (510)420-3336 <br /> Sincerely, ' K CO . <br /> Cambria Environmental Technology, Inc. <br /> No. 7659 <br /> Aubrey K Cool, P G <br /> Senior Protect Geologist ole C <br /> Figures 1 -Site Vicinity[WeII Survey Map <br /> 2-Groundwater Elevation and Chemical Concentration Map <br /> Attachment A-Blaine Groundwater Monitoring Report and Field Notes <br /> cc Denis Brown,Shell Oil Products US,20945 S Wilmington Ave, Carson, CA 90810 <br /> James Barton, Central Valley Regional Water Quality Control Board, 11020 Sun Center <br /> Drive,#200, Rancho Cordova, CA 95670 <br /> Nick Goya](property owner),41805 Albra Street, 2°d Floor, Fremont,CA 94558 <br /> • G 1,Stockton 620 W Charter Way\QMRs1200514g0514g05qrr doc <br /> 2 <br />