Laserfiche WebLink
A M B R I A Ms Vicki McCartney <br /> October 6, 2005 <br /> Site Investigation On August 31, 2005, Shell submitted a Subsurface Investigation Work Plan <br /> proposing cone penetration test(CPT)borings <br /> ANTICIPATED FOURTH QUARTER 2005 ACTIVITIES <br /> Groundwater Monitoring- Blaine will gauge and sample the site wells according to the existing <br /> sampling schedule and tabulate the data Shell will submit a groundwater monitoring report <br /> Site Investigation Shell will proceed with the proposed CPT investigation upon receiving <br /> written approval from SJCEHD Shell will submit recommendations for well installations with <br /> the report summarizing the CPT investigation <br /> HISTORICAL REMEDIATION SUMMARY <br /> . A soil vapor extraction (SVE) system operated at this site from September 1992 to <br /> November 1996 During this time, the SVE system removed approximately 17,628 pounds of <br /> vapor-phase total petroleum hydrocarbons as gasoline from the subsurface <br /> 2 <br />