My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS XR0001070
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
D
>
DR MARTIN LUTHER KING JR
>
620
>
3500 - Local Oversight Program
>
PR0544216
>
ARCHIVED REPORTS XR0001070
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/4/2019 9:02:03 PM
Creation date
3/4/2019 3:21:20 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0001070
RECORD_ID
PR0544216
PE
3528
FACILITY_ID
FA0003738
FACILITY_NAME
CHARTER WAY SHELL*
STREET_NUMBER
620
Direction
W
STREET_NAME
DR MARTIN LUTHER KING JR
STREET_TYPE
BLVD
City
Stockton
Zip
95206
APN
16504007
CURRENT_STATUS
02
SITE_LOCATION
620 W DR MARTIN LUTHER KING JR BLVD
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
WNg
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
59
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CAM B R l A Ms Vicki McCartney <br /> April 14, 2005 <br /> RECOMMENDATIONS <br /> Groundwater samples from all wells have been analyzed for ethylene dibromide and <br /> 1,2-dichloroethane for five quarters, and none have been detected in any of the wells Therefore, <br /> Cambria recommends that these analyses be discontinued In our SCM mentioned above, <br /> Cambria recommended reducing the sampling frequency of wells MW-1 through MW-6 and <br /> MW-10 to annual We will implement these changes with SJCEHD's concurrence beginning <br /> with the second quarter 2005 sampling event <br /> Cambria also recommended drilling four additional cone penetration test borings in our <br /> October 7, 2004 SCM If SJCEHD concurs with this recommendation, we will submit a work <br /> plan further detailing these activities <br /> HISTORICAL REMEDIATION SUMMARY <br /> iA soil vapor extraction (SVE) system operated at this site from September 1992 to <br /> November 1996 During this time, the SVE system removed approximately 17,628 pounds of <br /> vapor phase total petroleum hydrocarbons as gasoline from the subsurface <br /> 2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.