Laserfiche WebLink
SHELL WALL MONITORING DATA SHET <br /> TS #. b 3o a �I - Dtu-1 Site: ��� ��r, L� ,��� 0,qa <br /> Sampler: �>C.r{ LOCL t L Date: .2 ! 1 -o__I <br /> Well J.D.: eptul -3 Well Diameter. 2 3 G 6 8 <br /> Total Well Depth (TD): Depth to Nater (DT1). [qt 77 <br /> Depth to Free Product. Thickness of Free Product (feet): <br /> Refr,renced to: - Vc Grode D.O. MrAer (if re 'd): Ysr IIACM <br /> IDTW,*Yitb 80% Recharge ((Hei ght of Water Co lua-nn x 0.20) +DTW J: ��6 <br /> Purge Method. Bailer waterm Snmpling Method: Boder <br /> Disposable Boiler Paristaldc isposable Bailer <br /> Middleburg Extraction Pump Extraction Port <br /> }� Elecida Submersible Other Dedicated Tubing <br /> t � Other <br /> Well DIcancler Mulligner., WCII 0fnjTx4M Malplipr <br /> I" 004 44' 9 65 <br /> coals�x 3 — <br /> :27, � _aa15 x� o�,i 616 ,�7 <br /> 1 Casa Volume S ecified Volumes — CalcuJnlcd VOIUMU 3" 1137 Dtilar ndlus�-II.ICs3 <br /> Cond. Turbidity <br /> Time Temp (°F) PI-T (Ms 040 (NTUs) Owls.Removed Observations <br /> —7r 61 1 <br /> t1r. 3 � � �o <br /> Did well dewater7 Yes o Gallons actEially evacuated: Q <br /> Sampling Date* o3 Sampling Time: [")1: 50 Depth to Water: 2,2_ Lf 7 <br /> Sample X.D.: yltUj_3 Laboratory. SPL Other <br /> Analyzed for. TPTI-( BTEX MTBE TPH D Other. <br /> LB I D. (if applicable): Duplicate I.D. (if applicable): <br /> Analyzed for: -011-13 BTM MTBE TPI D Other: <br /> D.O. (if req'd): Pre-purge: 1"911, Post-purge: melt' <br /> IF.R-P. (if rcq'd): Pre-purge: MV Post-purge: rnV <br /> Blaine Tach Services, Inc. 1680 Rogers Ave., San Jose, CA 95'172 (800) 545-7558 <br />