Laserfiche WebLink
CAMBRIA <br /> REMEDIATION SUMMARY <br /> A sail vapor extraction (SVE) system operated at this site from September 1992 to <br /> November 1996 During this time, the SVE system removed approximately 17,628 pounds of <br /> vapor phase total purgeable hydrocarbons as gasoline from the subsurface <br /> CONCLUSIONS AND RECOMMENDATIONS <br /> Hydrocarbon and MTBE concentrations are within the historical norm for this site Cambria will <br /> submit recommendations for this site in the CPT investigation report, mentioned above <br /> CLOSING <br /> If you have any questions regarding the contents of this document, please call Aubrey Cool at <br /> (510)420-3336 <br /> Sincerely, <br /> Cambria Environmental Technology, Inc <br /> Lisa Summers <br /> Staff Scientist <br /> v GE <br /> H g <br /> QW 00 <br /> Joe W Neely, RG <br /> Senior Project Geologist No 6927 <br /> RG 6927 <br /> �OF Cp,1�C-O <br /> Attachments <br /> Figure 1 Site Vicinity/Well Survey Map <br /> Figure 2 Groundwater Contour/Cherucal Concentration Map <br /> Appendix A Blaine Tech Services, Inc -Groundwater Monitoring Report <br /> cc Ms Karen Petryna, Shell Oil Products US <br /> . Mr James Barton, Central Valley Regional Water Quality Control Board <br /> 0778 2 <br />