Laserfiche WebLink
CAMBRIA <br /> i <br /> REMEDIATION SUMMARY <br /> A soil vapor extraction (SVE) system operated at this site from September 1992 to <br /> November 1996 During this time, the SVE system removed approximately 17,628 pounds of <br /> vapor phase total purgeable hydrocarbons as gasoline from the subsurface <br /> CONCLUSIONS AND RECOMMENDATIONS <br /> Hydrocarbon and MTBE are within the historical norm for this site Cambria will submit <br /> recommendations for this site in the CPT investigation report,mentioned above <br /> CLOSING <br /> If you have any questions regarding the contents of this document, please call Aubrey Cool at <br /> (707) 933-2368 <br /> Sincerely, <br /> Cambria Environmental Technology, Inc. <br /> Susan Lukaszewicz <br /> Staff Geologist <br /> 9-1-&� ED GEO <br /> ��\S QH W 0 <br /> 1*- <br /> Joe W Neely,RG -< <br /> Senior Protect Geologist No 6927 <br /> RG 6927 <br /> OF CAL <br /> • <br /> 0778 2 <br />