Laserfiche WebLink
a <br /> . CAMBRIA <br /> REMEDIATION SUMMARY <br /> A soil vapor extraction (SVE) system operated at this site from September 1992 to <br /> November 1996 During this time, the SVE system removed approximately 17,628 pounds of <br /> vapor phase total purgeable hydrocarbons as gasoline from the subsurface <br /> CONCLUSIONS AND RECOMMENDATIONS <br /> Hydrocarbon and methyl tertiary butyl ether concentrations are within the historical norm for this <br /> site <br /> As discussed in a March 1, 2002 telephone conversation with SJCPHS/EHD staff, Cambria will <br /> discontinue dissolved oxygen measurements beginning with the second quarter 2002 sampling <br /> event <br /> CLOSING <br /> If you have any questions regarding the contents of this document, please call Aubrey Cool at <br /> (707) 933-2368 <br /> Sincerely, <br /> Cambria Environm <br /> ental echnology, Inc. <br /> Q�4V <br /> Lisa Summers <br /> Staff Scientist DW EO�O <br /> H AFF cJ� <br /> Joe W Neely, RG <br /> Senior Project Geologist ' No 6927 <br /> RG 69 27 <br /> SOF CRL1 <br /> 0778 2 <br />