Laserfiche WebLink
SHELL WELL MONITORING DA fA SHEET <br /> Project #: �I �� i /� Wsc # e-,1— <br /> Sampler: G Lam- Date Sampled: <br /> �Gd�3 <br /> Well Z.D. : JP Well Diameter: (circle one) 2 3 ® 6 <br /> Total Well Depth: Depth to Water: <br /> Before ' After Before After <br /> Depth to Free Product: ------ Thickness of Free Product (feet) : <br /> Measurements referenced to: cvva�A Other -- <br /> Valva..^--r.rai.f T...a(VCS tis VGF <br /> �• a <br /> 1 41 <br /> �.th-.'r(�) .C• • .W <br /> f+.1 Sr r • t H <br /> 1.tnJla.1 <br /> x 3 l <br /> 1 Case Volume Speczfied Volumes gallons <br /> Purging- Basler Sampling: Bailer <br /> Middl urg o Middleburg <br /> Electric Submersible a Electric Submersible a <br /> Suction Pump D Suction Pump n <br /> 0 Type of Installed Pump Installed P=ap E3 <br /> TI X TFE a. pH COND. TURBIDITY: VOLUME : <br /> �ME. OBSERVATIONS: <br /> `?6 <br /> Did Well Dewater?AVIf yes, gals. Gallons Actually Evacuated: <br /> Sampling Tams: <br /> Sample I.D. : Laboratory: <br /> t� �� ry: <br /> Analyzed for: r�Ile <br /> Duplicate I.D. : __,,,Cleaning Blank I.D. : <br /> 10 Analyzed for: <br /> Shipping Notations: <br /> Additional Notations: <br />