Laserfiche WebLink
Ms Linda Turkatte <br /> March 6, 1992 <br /> .� Page 3 <br /> samples will be collected and analyzed to verify compliance with the current waste water discharge <br /> permit conditions <br /> The remediation system will include installation of a soil vapor extraction and emission control <br /> system Installation of the vapor extraction system is pending equipment delivery and is tentatively <br /> scheduled for early March 1992 <br /> If you have questions regarding this letter report, please contact any of the undersigned <br /> at (916) 638-2085 <br /> Sincerely, <br /> DELTA ENVIRONMENTAL CONSULTANTS, INC. <br /> Charles K Almeida <br /> Project Geologist <br /> � ott Romine <br /> Project Engineer/Manager ,��k1ED GFG� <br /> James R Brownell ; �� 502$ <br /> Hydrogeologist <br /> (QMR109 HMB) <br /> 0rcAO. -o <br /> Enclosures/2 <br /> cc/enc Mr Kurt Miller, Shell Oil Company <br /> Mr Jim Maughan, Central Valley Regional Water Quality Control Board <br /> .4 <br />