Laserfiche WebLink
Task 9 Report Preparation <br /> Following the receipt of analytical results from the laboratory, Cambria will prepare a written <br /> report describing field procedures, laboratory results, and boring logs, and presenting a discussion <br /> of hydrocarbon and oxygenate distribution <br /> The scope of work described in this work plan will be performed under the supervision of a <br /> registered professional engineer <br /> Schedule <br /> Cambria is prepared to begin work upon receipt of written approval of this work plan by <br /> SJCPHS <br /> If you have any questions regarding the scope of work outlined to this work plan, please call <br /> Sincerely, _ <br /> Cambria Environmeptalech logy, Inc Z <br /> Diane M LundqgKs' t, P E <br />• Principal Engineer �\ <br /> C46725 <br /> Attachments Plate I Vicinity Map <br /> Plate 2 Site Plan/Proposed Boring Locations <br /> cc Mr Alex Perez, Shell Oil Products Company <br /> Ms Pat Anderson, Central Valley Regional Water Quality Control Board <br /> 375 5 <br />