Laserfiche WebLink
11-2d-1997 3 36PM FROM CAMBRIA SONOMA 70793SGS49 P 6 <br /> Task 9 Report Preparation <br /> Following the receipt of analytical results from the laboratory, Cambria will prepare a written <br /> report describing field procedures, laboratory results, and bong logs, and presenting a discussion <br /> of hydrocarbon and oxygenate distnbution <br /> The scope of work described in this work plan will be performed under the supervision of a <br /> registered professional engineer <br /> Schedule <br /> Cambria is prepared to begin work upon receipt of written approval of this work plan by <br /> SJCPHS <br /> If you Have any questions regarding the scope of work outlined in this work plan, please call <br /> Sincerely, '�Hssfo <br /> Cyb,,, Environmental T chn gy, Inc �D i u y Yql <br /> j� 4 <br /> Diane MLundquist, E � NO C46725 � <br />. Principal Engineer s 011k .� <br /> C46725 OF CAt�F4�`a\ <br /> Attachments Plate1 Viculiry Map <br /> Plate 2 Site Plan/Proposed Bonng Locations <br /> cc MrAles Perez, Shell Oil Products Company <br /> Ms Pat Anderson, Central Valley Regional Water Quality Control Board <br /> i <br /> 375 5 <br />