Laserfiche WebLink
18 July 2005 <br /> . AGE-NC Project No 97-0326 <br /> Page 5 of 5 <br /> 5.0. RECOMMENDATIONS <br /> Based on the findings of this investigation, AGE recommends <br /> ia Continuation of the quarterly ground water monitoring program, the next monitoring event <br /> is scheduled for June 2005 <br /> I & Installation of off-site monitoring wells, pending resolution of permitting and bond issues, <br /> to date,AGE has installed three of the eight monitoring wells proposed in the AGE-prepared <br />' Additional Monitoring Wells Work Plan, dated 26 July 2002 <br /> • Preparation of a work plan for interim remediation of petroleum-impacted soil and ground <br /> water <br />' 6.0. LIMITATIONS <br /> Our professional services were performed using that degree of care and skill ordinarily exercised by <br />' environmental consultants practicing in this or similar localities The findings were based upon <br /> analytical results provided by an independent laboratory Evaluation of the hydrogeologic conditions <br /> at the site for the purpose of this investigation was made from a limited number of available data <br />' points(i e ,ground water samples)and subsurface conditions may vary away from these data points <br /> No other warranty,expressed or implied,is made as to the professional interpretations,opinions,and <br /> recommendations contained in this report <br /> 1 <br /> I <br /> 1 <br /> I <br /> i <br /> Advanced GeoEnvironmentai,Inc <br />