My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2019
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
H
>
HAZELTON
>
1810
>
2300 - Underground Storage Tank Program
>
PR0231141
>
COMPLIANCE INFO_2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/21/2022 10:35:03 AM
Creation date
3/5/2019 8:58:17 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2019
RECORD_ID
PR0231141
PE
2361
FACILITY_ID
FA0003954
FACILITY_NAME
SJ CO PUBLIC WORKS CORP YARD*
STREET_NUMBER
1810
Direction
E
STREET_NAME
HAZELTON
STREET_TYPE
AVE
City
STOCKTON
Zip
95205
APN
15518002
CURRENT_STATUS
01
SITE_LOCATION
1810 E HAZELTON AVE
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\kblackwell
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
88
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Vapor Recovery Fill Riser <br /> i� <br /> X <br /> OPW <br /> Ball Float <br /> 14" Minimum <br /> Tube Cut <br /> Clearance for r per Loca I Float 4 " NPT <br /> Requirements Nipple <br /> 0 <br /> 6" <br /> �-- Align Float Along Length of Tank Swivel <br /> Hyewe 24 Product <br /> Jack <br /> Adaptor Screw <br /> Kit <br /> Orient socket <br /> adaptor be - FOR TESTABLE MODELS ONLY : Check installation <br /> tween jack again as done in Step 23 to ensure poppet actuates and <br /> screw bolts resets properly. See page 17 for full testing details . Ap - <br /> ply pipe dope to the socket adaptor threads . Pipe dope <br /> should be a non - hardening gasoline resistant pipe <br /> thread seal compound . Install socket adaptor and <br /> torque to 3 . 5 ft- lbs (42 in - lbs) minimum to 5 .0 ft- lbs (60 <br /> indbs) maximum . After installing socket adaptor where <br /> required, pressure test testable overfill valve per CARB <br /> TP201 . 1 D to ensure valve is vapor tight . <br /> Figure 24A <br /> 15 <br />
The URL can be used to link to this page
Your browser does not support the video tag.