My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2019
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
H
>
HAZELTON
>
1810
>
2300 - Underground Storage Tank Program
>
PR0231141
>
COMPLIANCE INFO_2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/21/2022 10:35:03 AM
Creation date
3/5/2019 8:58:17 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2019
RECORD_ID
PR0231141
PE
2361
FACILITY_ID
FA0003954
FACILITY_NAME
SJ CO PUBLIC WORKS CORP YARD*
STREET_NUMBER
1810
Direction
E
STREET_NAME
HAZELTON
STREET_TYPE
AVE
City
STOCKTON
Zip
95205
APN
15518002
CURRENT_STATUS
01
SITE_LOCATION
1810 E HAZELTON AVE
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\kblackwell
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
88
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
APR 1 8 2019 <br /> UNDERGROUND STORAGE TANK <br /> MONITORING SYSTEM CERTIFICATION FORM (Page s of s) IALTH <br /> XVI . MONITORING SITE PLAN <br /> Date site map was prepared : <br /> If you already have a site plan that shows all required information, you may include it, rather than this page, with your Monitoring System <br /> Certification Form. The site plan must show the general layout of tanks and piping and clearly identify locations of the following equipment, <br /> if installed: 1) monitoring system control panels; 2) in-tank liquid level probes (if used for leak detection); 3) devices monitoring tank <br /> annular spaces or vault,• 4) devices monitoring product piping; 5) devices monitoring fill piping; 6) devices monitoring vent piping; 7) devices <br /> monitoring vapor recovery piping; 8) devices monitoring vent/transition sumps; 9) devices monitoring under-dispenser containment; 10) <br /> line leak detectors; and 11) devices monitoring any other secondary containment areas. <br /> - - - - - - - - - - - -- -- - - - - - - - - - <br /> Site Address: SAN JOAQUIN CORP YARD 7810 NAZELTON STOCKTON CA 95203 <br /> ttivitennnot ilsibletoarea *PIPL\Ge KEY <br /> fxr�ssfarrtlopiraarron4arrinesde�ifw it{anatiornlytrrfxz e:- Drrn ink (ARROWS) A = ANN-[JIAR <br /> rntroacde Drawing of F = FILLS <br /> piptnv atat of T = TLIMNE <br /> stump and UDC's. P = PROBE <br /> Nounderground V = VAPOR <br /> dractmtg is % = SUMP SENSOR <br /> . 87 . . . W,91VALtvre _ L = Leak Detector <br /> cannot speculate DI = 11ralir c <br /> . . . 1 . F blueprints. B = Brie Sensor <br /> . . _ . . _ _ I = Smart Sensor <br /> S = STP <br /> C = Floam .ft Chaim <br /> E = E Stop <br /> . . . . . . . . . . . . . . . . <br /> OP <br /> F <br /> . P <br /> 0 <br /> . . . . . . . . . . . . . . . . . : BUILDING <br /> oto <br /> CAS <br /> dtg• item razirgiororltherare marrisibleiotitscet7({ringtocladdanar-ea <br /> Q�e=1o1L710f7flIIGlr Ora',l' atL{O"F sdrjr atntViornllxn2ut�c. Dttnril� <br /> riot to cede <br /> Date map tvas drawn: 3.8.18 A (Ctrl) ' <br /> Instructions <br /> If you already have a diagram that shows all required information, you may include a. rather than this page, with your Monitoring System Certfication. On your site plan, <br /> show the general layout of tanks and piping. CW_arly identify locatons of the following equipment, if installed: monitoring system control panels: sensors monitoring tank <br /> annular spaces, sumps, dispenser pans, spill containers, or other secondary containment areas; mechanical or electronic line leak detectors; and in-lank liquid level <br /> probes (if used for leak detec0on). In the space provided, note the date this Site Plan was prepared, <br /> LEGEND <br />
The URL can be used to link to this page
Your browser does not support the video tag.