My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2019
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
H
>
HAZELTON
>
1810
>
2300 - Underground Storage Tank Program
>
PR0231141
>
COMPLIANCE INFO_2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/21/2022 10:35:03 AM
Creation date
3/5/2019 8:58:17 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2019
RECORD_ID
PR0231141
PE
2361
FACILITY_ID
FA0003954
FACILITY_NAME
SJ CO PUBLIC WORKS CORP YARD*
STREET_NUMBER
1810
Direction
E
STREET_NAME
HAZELTON
STREET_TYPE
AVE
City
STOCKTON
Zip
95205
APN
15518002
CURRENT_STATUS
01
SITE_LOCATION
1810 E HAZELTON AVE
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\kblackwell
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
88
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
UNDERGROUND STORAGE TANK <br /> MONITORING SYSTEM CERTIFICATION FORM ( Paye s of 6) <br /> XVI . MONITORING SITE PLAN <br /> Date site map was prepared : 3/8/2019 <br /> If you already have a site plan that shows all required information, you may include it, rather than this page, with your Monitoring System <br /> Certification Form. The site plan must show the general layout of tanks and piping and clearly identify locations of the following equipment, <br /> if installed: 1) monitoring system control panels; 2) in-tank liquid level probes (if used for leak detection); 3) devices monitoring tank <br /> annular spaces or vault; 4) devices monitoring product piping; 5) devices monitoring fill piping; 6) devices monitoring vent piping; 7) devices <br /> monitoring vapor recovery piping; 8) devices monitoring vent/transition sumps; 9) devices monitoring under-dispenser containment; 10) <br /> line leak detectors; and 11) devices monitoring any other secondary containment areas. <br /> Sae Address: SAN JOAQUIN CORP YARD 1810 HAZELTON STOCKTON CA 95203 , <br /> trot iisibletofit? cer7(6iinriechiicimrLye a *PIPLNG } KEP <br /> p-qf neiotialop'riottonh• atriaescde(t•fa- i rdonrrrhotrrlprrpWes. Drmring (ARROWS) A = ANNULAR <br /> rortoscde Drawing of F = FILLS <br /> Piping etat of T = TURBINE <br /> sump and UDC's. P = PROBE <br /> No underground V = VAPOR <br /> dratvinn is X = SU\iP SENSOR <br /> S _ 91 . . . 87. ' tv"e L = Leak Detector <br /> cannot speculate M = Alan ay <br /> . - <br /> Ex <br /> . 1 blueprints. _ B = Brine Sensor <br /> I = Smart Sensor <br /> 5 = 5TP <br /> C = Flom & Chains <br /> E = E Stop <br /> . A . _ . <br /> gI A <br /> P ` P <br /> BUILDING <br /> A _ . . . . _ . . . - - . . . . . . . . . . . <br /> oto . _ . . . . . . . . _ . . . _ . n . . - - . <br /> CAS oil <br /> itr Hants rnrl rgtmnrl fha are nor visible to dw ceti((ting teelaaicint? a-e a <br /> prgf�rsiotarlopiriaratq'carch-e sde$•fa- ir¢arnntiornlprngx;�. Drmrirg <br /> not to scope <br /> Date map was drawn: 3.8-19 <br /> Instructions <br /> If you already have a diagram that shows at required information, you may include it, rather than this page, with your Monitoring System Certification. On your site plan, <br /> show the general layout of tank's and piping. Clearly identify locations of the following equipment, if installed: monitoring system control panels; _senors monitoring tank <br /> annular spaces, sumps, dispenser pans, spill containers, or other suendary containment areas; mechanical or elewront line leak detectors; and in-tank liquid level <br /> probes (if used for leak detection). In the space provided, note the date this Site Plan was prepared. <br /> LEGEND <br />
The URL can be used to link to this page
Your browser does not support the video tag.