Laserfiche WebLink
MENNEN <br /> UNDERGROUND STORAGE TANK <br /> MONITORING SYSTEM CERTIFICATION FORM (Page s of s) <br /> XVI . MONITORING SITE PLAN <br /> Date site map was prepared : 3/8/2019 <br /> If you already have a site plan that shows all required information, you may include it, rather than this page, with your Monitoring System <br /> Certification Form. The site plan must show the general layout of tanks and piping and clearly identify locations of the following equipment, <br /> if installed: 1) monitoring system control panels; 2) in-tank liquid level probes (if used for leak detection); 3) devices monitoring tank <br /> annular spaces or vault, 4) devices monitoring product piping; 5) devices monitoring fill piping; 6) devices monitoring vent piping; 7) devices <br /> monitoring vapor recovery piping; 8) devices monitoring vent/transition sumps, 9) devices monitoring under-dispenser containmentm 10) <br /> line leak detectors; and 11) devices monitoring any other secondary containment areas. <br /> - -- - -- - - -- - - - - - - <br /> Site Address: SAN JOAQUIN CORP YARD 1810 HAZELTON STOCKTON CA 95203 <br /> lrritencurrkrgitxarlthorarenot iisibletothe *PIPL\G } KEY <br /> pr-gf'ssiatril opitdctt Onho atrTn'e Td E( frritiontntiotnlyitrpxir Drrnring (ARROWS) - A = AN.NnAR <br /> fur tosede Drx"ineof F = FILLS <br /> piping a it of T = TURBINE. <br /> sump and UDC's. P = PROBE <br /> No undereround V = VAPOR <br /> dranatto is \ = SU.% P SENSOR <br /> . - - S . - .Ol 87 . V'Cilufr INM L = Leek Detector <br /> cannot speculate Ill = lUaatvay <br /> 1 \ EX . . . blue prints. B = Brine Sensor <br /> I = Smart Sensor <br /> S = STP <br /> C = Floats & Chaim <br /> E = E Stop <br /> . . . _ <br /> . _ . . . . . . . _ . . . . . . BUILDING <br /> oto . tt .. . . . . <br /> . . <br /> CAS L _ . . . . . . . <br /> Ar(" Rent: rnrkrgrorarl tlicr are not visible ro fl: celli6ing tcrlwicfnn a a a <br /> preessfoittlopfrimioia4• alt{a-esdekifa- fifibinuioirdprap ice DimilT <br /> lut to scde <br /> Date map was drawn: 3-8.19 (LLTI) <br /> Instructions <br /> If you already have a diagram that shows all required information, you may include it. rather than this page. with your Monitoring System Certification. On your she plan , <br /> show the general layout of tads and piping. Clearly identify locations of the following equipment, if installed: monaormg system control panels; sensors monitoring tank <br /> annular spaces, sumps, dispenser pans, spill containers, or other eerandary containment areas: mechanical or electronic line leak detectors; and in-tank liquid level <br /> probes (if used for leak detectan). In the space provided, note the date this Site Plan was prepared. <br /> E <br /> it t <br /> i ' <br /> LEGEND <br /> `��( <br /> APR; NN11RONMENTAL HEALTH <br /> T 201 <br /> DEPARTMENT <br />