Laserfiche WebLink
UNDERGROUND STORAGE TANK <br /> MONITORING SYSTEM CERTIFICATION FORM (Page 6 of s) <br /> XVI . MONITORING SITE PLAN <br /> Date site map was prepared : <br /> If you already have a site plan that shows all required information, you may include it, rather than this page, with your Monitoring System <br /> Certification Form . The site plan must show the general layout of tanks and piping and clearly identify locations of the following equipment, <br /> if installed: 1) monitoring system control panels; 2) in-tank liquid level probes (if used for leak detection); 3) devices monitoring tank <br /> annular spaces or vault, 4) devices monitoring product piping; 5) devices monitoring fill piping; 6) devices monitoring vent piping; 7) devices <br /> monitoring vapor recovery piping; 8) devices monitoring vent/transition sumps; 9) devices monitoring under-dispenser containment; 10) <br /> line leak detectors; and 11) devices monitoring any other secondary containment areas. <br /> - - - - - -- ----- - - --- - - <br /> Site Address: f SAN JOAQUIN CORP YARD 1810 HAZELTON STOCKTON CA 95203 <br /> -ttp• item; urrk)-jrotarithcrorenottifsiNe to liar erea *PIPL\G } I EI <br /> pqf-ssiarnlopirdcrtatrh mrlcae :ole4fca irdmnntforalprngarc_ Dnmrh?, (ARROWS) A = ANNIMAR <br /> rottoscde Dravvingof F = FILLS <br /> piping erdt of T = TURBLLYE <br /> . _ . . - sump and UDC's. P = PROBE <br /> No underground V = VAPOR <br /> draurargis Y = SUAIPSENSOR <br /> .91 - 87 . . . VCj&%ta, ae - L = Leak Detector <br /> cannot speculate AI = Ahra-ay <br /> blue prints, B = Brine Senor <br /> I = Smart Sensor <br /> S = STP <br /> . . . - . . . _ . _ C = Floats & Chains <br /> E = E Stop <br /> . . _ . . <br /> . - . . <br /> . . BUILDING <br /> _ . <br /> ote <br /> . . . . . _ - - - - - - - - . . - . . . . . . . . <br /> . - M I CAS <br /> Aqv iter; rnrkrgrororl tha ore not risible to flip cet7i6ing terlatieinn a-e a <br /> �- <br /> Dim rg <br /> rot to scde <br /> Date map ryas drawn: 3.8-19 <br /> Instructions <br /> If you already have a diagram that shows al required information, you may include it rather than this page, with your Monitoring System Certification. On your sae plan, <br /> show the general layout of tanks and piping. Clearly identify locations of the following equipment, if installed: man itarmg system central panels; sensors monitoring tank <br /> annular spaces, sumps, dispenser pans, spill containers, or other secondary containment areas: mechanical or electronic line leak detectors; and in-tank liquid level <br /> probes (if used for leak detecton). in the space provided, note the date this Site Plan was prepared. <br /> X <br /> lcr irl ) <br /> LEGEND <br /> App � $ '1019 <br /> ENVIRONMENTAL H EALTFI <br />